My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
421 85TH PL SW 2018-01-02 MF Import
>
Address Records
>
85TH PL SW
>
421
>
421 85TH PL SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2022 8:43:24 AM
Creation date
4/19/2017 1:23:54 AM
Metadata
Fields
Template:
Address Document
Street Name
85TH PL SW
Street Number
421
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
426
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I AUd .1 y `1w <br />CONSTRUCTION CONTRACT <br />(Not a partnership) <br />The undersigned Owner, as the owner and developer of the project described as: <br />Casino Road Apartments Project (North Satellite) <br />which to located at: 8515 5th Avenue West, F rprPt+ WA 98204 <br />and the undersigned Contractor, who desires to furnish part of the work required to construct the project, <br />agree as follows: <br />1. WORK: Contractor shall provide and pay for the following described work at the project: <br />P... . <br />Contractor shall supply all material, equipment and labor to <br />install the water system complete and in strict accordance with <br />the engineering plans and specifications entitled Casino Road. <br />water System <br />38,972.00 <br />PUN f 8 1981. <br />No payment will be made for any additional work unless authorized <br />in advance by a written change order. <br />2. PRICE AND PAYMENT. Owner shall pay Contractor a total price of $ —T which shall be <br />payable in proportion to the progress of the work monthly on the 15 th day of each month for work com- <br />pleted during the preceding month, provided that Contractor shall have submitted a written request for pay- <br />ment inform specified by Owner prior to the preceding 1st— day of the month. From sums otherwise par- <br />able Owner may retain _ Q _— percent until time for final payment which is 30 days after the work is fully <br />performed and accepted by Owner. Contractor's right to any payment is subject to proper and timely perfor- <br />mance of the work and to the condition that Contractor shall furnish evidence that potential liens that might <br />attach to the property by Contractor's activities have been waived, released or ethenvise satisfied in a manner <br />acceptable to Owner, Retail sales taxes arising for Contractor's work furnished shall be p dd by Owner directly <br />to the state. <br />3. PERFORMANCE: Contractor shall furnish all tools, materials, equipment, supplies, permits and <br />skilled, qualified workmen and supervision necessary to perform the work in a t,orkmanlike and diligent <br />manner. Time is of the essence. The work shall commence upon reasonable notice from Owner and shall con- <br />tinue without interruption by Contractor until completed. As long as Owner makes p u-t of the project avail• <br />able for Contractor's work, Contractor shall meet the established schedule fcr performance, The coordination <br />of the various parts of the work Letween Owner, Contractor and others shall'be under the direction of Owner's <br />designated superintendent of the project. Contractor shall comply with the directions given by such superin- <br />tendent with respect thereto. All work shall be performed to comply with all applicable governmental laws, <br />rules ar-d regulations including building codes ind the Occupational Safety and Health Act. of 1970 (OSHA). <br />Contractor shall furnish all Samples, chop dra• ings and other technical data as maybe required for the work. <br />The work shall be subject to inspection and approval by Owner, and Contractor shall timely secure the neces- <br />sary governmental approvals as are n:quiree incident to Contractor's work so that the progress of the entire <br />project is not delayed. As a part of Contractor's work, Contractor shall be responsible for verifying field condi- <br />tions and dimensions and shall do all cutting, fitting and patching that may be required to make the several <br />parts of the entire project fit together properly with Contractor's work. No inspection or approval of Contrac- <br />tor's work or any part thereof by Owner shall constitute a waiver of Contractor's obligations to perform the <br />work as required hereby. Upon comp'. etion of Contractor's work and each part thereof, Contractor shall leave <br />the affected premises in a bruin -clean condition and shall remove and dispose of all of its equipment and <br />surplus materials and supplies away from the project, <br />4. DErAULT. In the event that 0 mtractor shall fail to perform any of the terms and conditions hereof, or <br />shall fail to correct progress of its performance of the work within 5 days after notice from Owner specifying <br />that the work is not progressing satisfactorily and that timely performance is endangered, or shall suffer any <br />judicial proceedings on account of insolvency or make any assignment or trust mortgage for benefit of cred- <br />iwre, then Contractor shall be in default hereunder. In addition to any other rights and remedies it may have, <br />on default Owner shall have the right upon 24 hours written notice to Contractor to terminate Contractor's <br />':l:11:. ]l r::_'.: e'.^'.t_oy,,".r nley take poPBasri en of the rontraetar'6 teals, equipment, <br />
The URL can be used to link to this page
Your browser does not support the video tag.