Laserfiche WebLink
rnNd <br />Bob Landles, Planning Department 1, ,- O e) <br />rp <br />Public Works Department &CL/A <br />January 3, 1960 <br />S.E.P.A. Checklist Review 1175 <br />PROPOSAL: <br />of 2 and 3 <br />on 8.85tacres at S.E.rcorner eof Casino nt Xand 1lardesonatory buildings <br />Roads. <br />RECOMMENDATIONS: <br />of isNthe <br />nee D cld.rr,tion f the <br />ubjectit Wthesfollowingnt that issuance <br />1. A detailed drawing shall be submitted to the Public Works, <br />Department showing parking layout, landscaping, <br />utilities, storm drainage, <br />bAll <br />required <br />t <br />ements to <br />the public right-of-way. pulicWorksDepartmenapproval <br />ermits are issues. <br />of these drawings la required before an, D <br />completed bef�,re the Occupancy ?'ermit <br />All improvemen..s shall be <br />is issued. <br />As -built,, casement, and a one year Warrantee Bond in the <br />he public water <br />amount of 10$ of the cost of construction dongofoftobtaining public <br />system are required within '10 working day. <br />water connection. <br />2. City street are to be kept clear of dirt and debris during <br />construction. <br />3. During construction, all truck traffic to and from the site <br />within the City of Everettshall be on <br />ublicWorks ArteDeparial streets unless <br />otherwise approved by <br />the q. Compliance with the provisions of Ordinance 556-78 for traffic <br />mitigation is required (140% <br />entire Ca <br />assessment is allowed, reduction <br />uf <br />basedeatrafficgeneration)s.no Road. <br />5. Ten feet of right-of-way along flnrdenon Road shall be deeded <br />to the City of Everett. <br />ary <br />ion <br />6. rutic Work <br />isrcquiredvprior tomcommencing scontrol site preparation. <br />ovision <br />or <br />nd <br />removal <br />7. On-site <br />required. <br />A detailedrdrainagefplaniisasediment <br />required. Drainage <br />ealcualtions are to be submitted with the .attached cover sheet. <br />TC'he rainaBa plan ahall include creek relocation §CIIaY <br />8. Participation in the program to fund the south end sanitary .2 , <br />sewer interceptor is required. <br />V wk <br />