21 <br />will be routed into a system requiring upgrading. <br />Project sponsors will therefore be paying an initial <br />capital contribution of $170 per unit to the fund for <br />improvement of the South End Interceptor (total contri- <br />bution - $36,720) in addition to the normal hookup charges. <br />Stormwater Drainage <br />Stormwater drainage will be placed in a system requiring <br />protection from pollution and excess peak flows. Storm - <br />water detention and pollution -control measures will <br />therefore be utilized to mitigate these im?acts. (see <br />also, above - Water) <br />Solid Waste Disposai <br />No unusual demands w'_11 be placed on facilities. The <br />ultimate disposal site serves a large area, encompassing <br />most of the area where population would increase anyway, <br />it did not occur at this site. <br />17. Human Health <br />No hazard to human he.3lth is expected to occur. The <br />higher external noise levels to which the site may be <br />exposed will be mitigated by a berm, building placement <br />and building insulation. <br />18. Aesthetics <br />The site will change from a dense deciduous woods to an <br />open site, with buildings and paving. This is not expected <br />to be offensive, as it will be landscaped and screened, <br />with buildings having :good siding and varied placement <br />and mass. The development of these three adjacent sites <br />should merge the area aesthetically with the other developed <br />sites along this Casino Road frontage. <br />