Laserfiche WebLink
NO'J-'0-41 FFO11 '-PEST. Inc. <br />TO 120635z65p1 P,oa <br />n <br />(differential settlement should not be a problem), and berause this soil has <br />been preloaded with the upper six feet of soil for the past thirty years. <br />Because the soil is essentially granular, and it has been preloaded for so <br />long, moat long term settlement is expected to have already occurred. <br />Based on my investigation and findings, it is my opinion that the soils on the <br />subject sites are adequate to support typical two story house loads. <br />Please do not hesitate to contact me if there are any further questions or <br />Problems regarding these matters. <br />Sincerely, <br />Tanm <br />K G r n PE <br />ager of RngtneecSt g <br />2 <br />i <br />