Laserfiche WebLink
Dates? �? <br />Aophcntion For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />G <br />Der. tribe Proposed Work <br />City <br />PuMq Wdike P�e��mll} �`-' T 5 <br />Bldg Dept e .r7uy� <br />Public Winrka FN , <br />Total Fee <br />Leo Appl Fee Paid 8 -- <br />Bebnce Due ti 760. Va <br />7 sar <br />Zip Phone/, -- <br />Protect Address (if known) <br />Attach four (4) copies of plans for proposed work - Draw to state and note the following as applicable: <br />• Property Lines • Centerline of street <br />• Outline and dimensions of all existing and • Indicate North <br />• Show any proposed grading changes <br />proposed structures on the lot <br />•Show measurements <br />• Existing and proposed utilities <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hrs, In advance - phone 259.8815. <br />2. All work shall be performed In accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications, <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1 -800-424.5555. <br />Approved for Consru,,tion <br />Date <br />FINAL INSPECTION <br />Date <br />Approved as Constructed <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />i <br />Everett. WA 98201 <br />Phone: 259.8615 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />LU <br />z <br />0 <br />U) <br />0 <br />am <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs. <br />7xpenses, or causes of action that may arise because of installation <br />and maintenanue of the improvement or other right-of•way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. <br />Igna ure of Applic Date <br />WORK AUTHORI2 D BY THIS RMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER 15 TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />