Laserfiche WebLink
Date <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />n <br />Public Works Palml r <br />Bldg Deft <br />Public Works FOR $ <br />Total Fee <br />Lose AMI Fee Pold $ <br />Balance Due <br />Applicant Meiling Address City zip Phone <br />Describe Proposed Work <br />Project Address of known) <br />Attach tout (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines • Centerline of street <br />• Outline and dimensions of all existing and • Indicate North <br />proposed structures on the lot • Show any proposed grading changes <br />• Existing and proposed utilities • Show measurements <br />PERMIT CONDITIONS <br />1. All cells for inspection shall be made 24 hrs. In advance - phone 259.8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construr lion <br />Standards and Specifications. <br />3. Cell Location Underground Service 48 him before you dig. TOLL FREE NUMBER 1.800.424.5555. <br />I <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />everett PUBLIC WORKS DEPARTMENT <br />Ever Ceder Street <br />Everett, WA 98201 <br />Phone: 259.8810 <br />Pf ? ,Ak"'6"y <br />ACKNOWLEDGEMENT OF CONDITIONS <br />O <br />H <br />N <br />O <br />a <br />The undersigned owner/Applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation <br />and mninlenance of the improvement or other right-of-way use hereto <br />at id for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />