My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
708 90TH PL SE 2018-01-02 MF Import
>
Address Records
>
90TH PL SE
>
708
>
708 90TH PL SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2022 3:22:45 PM
Creation date
4/19/2017 1:48:24 AM
Metadata
Fields
Template:
Address Document
Street Name
90TH PL SE
Street Number
708
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ss <br />f NOTICE <br />everet <br />AN/D% INSPECTION REPORT <br />Address of building 2e eet A• S z- <br />Permit No.1 7 c ' _ [I-tt nidentlal ❑ Commercial <br />TYPE OF INSPECTION REQUESTED <br />Footing ❑ Foundation lace and Chimney ❑ Concrete Slab 0 Framing <br />* Drywall Nailing [] Final ❑ Electrical Service F1 Electric Rough -In ❑ Electric Final <br />* Plumbing Rough -In jj Plumbino Final ❑ Code Compliance [] Other- <br />�-APPROVAL FI PARTIAL APPROVAL <br />n VIOLATION n CORRECTION REQUIRED <br />NO PERMIT -- STOP WORK — REMOVE CONSTRUCTION or OBTAIN PERMIT and <br />make work comply with City Ordinances and Codes. <br />❑ CONSTRUCTION IWORKI 15 NOT IN COMPLIANCE WITH APPROVED PLANS, PERMIT <br />AND CODE — STOP WORK. Remove or make work comply with approved plans & code. <br />❑ Corrections listed below MUST BE MADE before work con be approved. <br />❑ APPROVED FOR OCCUPANCY subject to certificate of occupancy. <br />Work listed below has been inspected and approved. <br />Please contact Inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />❑ CALL FOR REINSFECTION -- 24 hour notice required. <br />r0 <br />The actions or corrections listed above are required within <br />Call 259•8745 for Inspection. <br />p}-BUILDING E"OUSING <br />❑ ELECTRICAL ❑ MECHANICAL <br />I was present during this Inspection. <br />days. <br />p SEWER <br />❑ ZONING <br />
The URL can be used to link to this page
Your browser does not support the video tag.