My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
714 90TH PL SE 2018-01-02 MF Import
>
Address Records
>
90TH PL SE
>
714
>
714 90TH PL SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2022 3:36:59 PM
Creation date
4/19/2017 1:50:06 AM
Metadata
Fields
Template:
Address Document
Street Name
90TH PL SE
Street Number
714
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order <br />Issued By WMW WARD, MICHAEL W. <br />Issued Department Pw PUBLIC WORKS <br />Date Issued 11/12005 <br />Fund 401 Account 5 Program 710 Function 119 Activity 675 <br />Program <br />Title REPAIR 714 90TH PL SE 710119675 <br />Work Order No 20051045 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br />Date TI/I/2005 Time 14:49 Original WO Billing <br />REPLACE BROKEN CURB STOP WITH SETTER <br />Structure ID <br />StrTvp Acliv t Comol Date Time Completed <br />WS1885LO32 <br />WASRVC YES 1117/2005 <br />Address <br />714 90TH PL SE <br />Cross Street <br />Area Designator <br />Map Reference <br />Structure Loca1101, <br />U.TH PL SE - 714 <br />Location <br />Vehicle Costs <br />Type Vehicle No <br />Description Hours Coat Billing Dale Billing Code <br />V J0026 <br />1997 FORD 1 TON SVC TRUCK 4 27.6 11/072005 <br />V J0046 <br />1999 STERLING 5 YARD DUMP 4 63.6 11/072005 <br />V M0043 <br />2003 TIGER VACTOR 4 116.8 111072005 <br />Total Vehicle Cost $208.00 <br />Material Costs <br />Type Maier No _ <br />Description Quantity _ Cost Billing Date Billing C <br />M ADAP34000547 <br />ADAPTER 314 MIP X 314 IPS INSTA-TITE 1 8.592 11/082005 <br />M BOX000056247 <br />BOX METER PLASTIC 15 X 10 WILD AND Cl READER IS 1 14.282 11/0&2005 <br />M COUP34142747 <br />COUPLING 314 CTS COMPRESSION X 3/4 MIP 1 4.82 1 f/082005 <br />M ELL034104247 <br />ELBOW 3/4 NPT 90 DEG STREET CAST BRASS (114 BEND) 1 1.629 11/082005 <br />M PIPE34060647 <br />PIPE 34 POLY IPS 2 .402 11/08/2D05 <br />M SETT34146547 <br />SETTER COPPER 518 X 3/4 (HEIGHT 9) NO LEG LENGTH H 1 47.70 1/0812005 <br />Total Material Cost s77.a3 <br />NA Costs <br />Type Na No <br />Description Quantity Cost Billing Date Billing Code <br />NA N/A <br />314 METER JUMPER 1 2 11/0812005 <br />Total NA Cost $2.00 <br />Personnel Costs <br />Type ID <br />Name _ Hours Cost Billing Date Earning Code Class <br />Total Personnel Cost $231.80 <br />Total Cost $519.23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.