Laserfiche WebLink
Date/' <br />Applicalion For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />Address <br />Describe Proposed Work <br />Project Address (If known) <br />Public Works Per • / � �_�� <br />Bldg Dept • LQ( <br />Public Works Fee <br />Total Fee >4 <br />Leo Appt Fee Paid f <br />alliance Due S <br />Phone <br />City ilJ zip <br />�. <br />A, <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines • Centerline of street <br />• Oullins and dimensions of all existing and • Indicate North <br />proposed structures on the lot • Show any proposed grading changes <br />• Existing ;nd proposed utilities • Show measurements <br />PERMIT CONDITIONS <br />All calls for inspection shall be made 24 hra In advance - phone 259.8815, <br />All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />Cell Location Underground Service 48 hrs. before you dig, TOLL FREE NUMBER 1.800-424.5555. <br />T <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />E <br />PUBLIC WORKS DEPARTMENT <br />Ever tt, WA Street <br />Everett. WA 98201 <br />Phone: 259.8815 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />W <br />C / <br />M <br />O <br />z <br />O <br />IME <br />Cn <br />O <br />a <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims'hr damages, costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />