Laserfiche WebLink
5 <br />CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />05/12/1995 Page 1 <br />Date Range :01/09/1989 - 05/11/1995 <br />CM Work Order Range :1001091070001 - 8801086100085Pattern :7401196751272 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7401196751272 Title: CONVERT 727 90TH PL SE <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: WS1885L040 -- WATER SERVICE <br />Location ID: -- <br />Program 740 Function 119 Activity 675 <br />Date Completed: 05/10/1995 <br />Overall Craft: <br />Issued: 05/10/1995 Issued by: JSM Assigned to: <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />----- ------ <br />Name <br />------------------------------ <br />Planned Hrs <br />Actual Hrs <br />Cost <br />UL MWF. <br />MOORE, WARREN E. <br />----------- <br />0.00 <br />---------- <br />3.00 <br />---------- <br />45.09 <br />WST NSO <br />NIELSEN, SCOTT 0. <br />0.00 <br />3.00 <br />49.68 <br />Total Labor Cost: <br />94.77 <br />Materials: <br />ID <br />------------ <br />Description <br />------------------------------ <br />Date <br /># Used <br />Cust <br />ADAP34000347 <br />ADAPTER 3/4" CST X <br />INSTA-TITS@ <br />-------- <br />05/10/1995 <br />-------- <br />3 <br />---------- <br />23.04 <br />ADAP34000647 <br />ADAPTER 3/4" FIP X <br />INSTA-TITE@ <br />05/10/1995 <br />1 <br />7.04 <br />BOX000056247 <br />BOX METER PLA 15" X <br />10" W/LID <br />05/10/1995 <br />1 <br />12.94 <br />COUP34004347 <br />COUPLING 3/4" MIP X <br />COP ELL @ <br />05/10/1995 <br />1 <br />3.78 <br />PIPE34060647 <br />PIPE 3/4" POLY I.P.S. <br />05/10/1995 <br />3 <br />0.75 <br />VALV34008648 <br />VALVE METR 3/4" L/W <br />FLARD COP@ <br />05/10/1995 <br />1 <br />10.17 <br />VALV3414344'/ <br />VALVE METR 3/4" ANGLE <br />CHECK @ <br />05/1C/1995 <br />1 <br />10.88 <br />Total Material Cost: 68.60 <br />Vehicles: <br />ID Description Hours Cost <br />------------------------------------------ ---------------- <br />V2139 86 CHEV 1-TON W/HYD. UNIT 3.00 15.00 <br />---------- <br />Total Vehicle Cost: 15.00 <br />Work Description: <br />-------------------------------------------------------------------------------- <br />METER# JUMPER <br />NO METERS IN STOCK. DIMINSIONS ON CHART ARE CORRECT. <br />