Laserfiche WebLink
Datelz��ry�� <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />1ti <br />P•R-A• 6ONIT �'ACTc_R <br />Owns- ng ACCress <br />Appllcanl <br />City Zip <br />F ,bft Wnrka Permx a — 0,02 <br />B'dg Depta i�/ / 5�e <br />Pebkp Worka Fe. <br />7-,1 Fe. <br />lose Appt Fee Paid S <br />salaMa Co. 6 2a�00 <br />Describe Proposed Work �OF -!5, f H (oLZ FAVA 1t rFF f C5 <br />9031- OQ1 SE <br />Project Address (if <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines • Centerline of street <br />• Outline and dimbrllons of all existirg and • Indicate North <br />proposed structures on the lot • Show any proposed grading changes <br />• Existing and proposed utilities • Show measurements <br />PERMIT CONDITIONS <br />A GS-1-7300 <br />Phone <br />Phone <br />1. All calls for inspection shell be made 24 fire. In advance - phone 259.881 5. <br />2. All work shell be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specification& <br />3. Cell Location Underground Service 48 hr& before you dig. TOLL FREE NUMBER 1.800.424.5555. <br />D <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201 <br />Phone: 259.8815 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />1 <br />�1 <br />D <br />z <br />O <br />Cl) <br />O <br />a <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any a•id all claims for damages, coat& <br />expenses, or causes of action that may arise because of Installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agr es to remove same upon notice from the <br />City and to replace public pr perty damaged thereby. <br />Slbneture of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER 13 TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />