My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1025 90TH ST SW 2018-01-02 MF Import
>
Address Records
>
90TH ST SW
>
1025
>
1025 90TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2025 3:23:49 PM
Creation date
4/19/2017 1:55:57 AM
Metadata
Fields
Template:
Address Document
Street Name
90TH ST SW
Street Number
1025
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPUANCE <br />REOUIRED Gr <br />01 <br />INSPECTION <br />APPROVED <br />IC <br />III <br />C <br />a <br />tJ <br />O <br />ID <br />Im-1 <br />0 <br />IMPORTANT: Please supply Information In the shaded boxes and check the appropriate <br />circles. Disregard loplcs that don't describe your building or equipment. DO NOT place <br />checks In the two left columns. <br />No. Manufacturer Framo material # <br />,'L <br />Z <br />G <br />�L <br />Z <br />r/ <br />Soo the Weshington glazing directory <br />Model # Area (F12) Uo value Tested? <br />91 Single Glazing (No more dan Ix of healed flea eras born° doublIng. S. ao2.») I IU._ Yes a <br />Type: <br />No: <br />Araa: <br />X2 I <br />U. <br />Yos <br />Type: <br />No: <br />Area <br />X2 I <br />ju.— <br />os <br />Untested Glazing (t)e ady default U-vakies h chapter to, S. t000.f ) <br />No: Area: <br />No: Area: <br />TOTAL GLAZING AREA (Add eniire column) —► I 7ZTj <br />Maximum Allowed glazing area(S. 602.7A) Is daPW- y taking the the total glazing area <br />ol_.. lgtO _._ Ft2 and dividing by the total conditioned floor area of A4MO—........Ft2. <br />Multiply this number by 100. This value can! axoeed ilia glazing percentage for your selocted option: <br />Q s 10%(Option i) j s 212%1% (Options II, Ili) s 1 % (option IV)Vil QOptlon VI lq <br />16°ya(17plbn V) C7 { 21°k (Option !I) s 25% (Option Vlq a a �. <br />Glazing /° <br />)Glazing -iocumantatiotdnsuticient, UaaYtes shall be justiliod by Mir. testing report. <br />O r! Glazing air leakage(S. 502.4.3 (c)) meas fires shall be met as follows <br />1) fixed site bulll: slops with sealant. <br />2) operating site built: weatherslripped with closer <br />ED Is Concealed Insulation shall be placed: 1) Behind showor/lub 2) Behind partition studs/corner <br />O M Standard air leakage caulking Is complete and Installed In the lollowing locations (S. 502.4.3) <br />Y) between Sole plate/subfloors 4) partition stud penetrations <br />2) wiring/plumbing/duct register penetrallans 5) light fixture/ flue penetrations <br />3) rim joists/mud sills (healed lower Iloors) 6) around window and door fray <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.