Laserfiche WebLink
tic I r B II 5 P 1,F'r <br />C1,ermit# B000rD-ai, <br />Instructlons: <br />1) Carefully review fire requirements of each of the options below. Choose an option that best suits your <br />dwelling design. Glazing percentage typically determines which option to choose. Your building must match <br />the selected Option requirements without exceptions or substitutions. <br />2) In the shaded areas on the pages (fiat follow, make checks In the circles next to the requirements of your <br />Option (the Option numbers are In parotheses next to the choices). Disregard components or equipment that <br />don't apply to your project. Your permit will be processed more efficiently if your rovido all of fire requested <br />Information. Department staff can help you with general questions about this form. <br />Can't comply? If nono of the Chapter 6 Options are acceptable, consider the Chapter 5, Component <br />Performance, Approach. The main advantage Is flexibility to juggle Individual R and U-values as long as a n <br />overall maximum ialue Isn't exceeded. Note that the overall thoraml requirements of Chapter 5 are no loss <br />stringent than Chapter 6. Calculations may be performed with a Chapter 5, Component Performance <br />Worksheef, or by using an acceptable computor program such as WATTSUN 5.1. <br />Plan Review <br />OPT I <br />OPT II <br />OPT III <br />OPT IV <br />OPT V <br />OP7 VI <br />r PT VIIOPT <br />r. 7sVIII <br />O <br />O <br />O <br />O <br />o <br />O <br />(Fa ofrrclel uaa only)O <br />Glazing max: <br />The selected Option Is <br />% of floor <br />10% <br />12% <br />12% <br />15% <br />18% <br />21 % <br />250/6 <br />20% <br />appropriate for this <br />U-value <br />0.40 <br />0.43 <br />0.40 <br />0.40 <br />0.39 <br />0.36 <br />0.35 <br />0.32 <br />dwelling design. <br />YES El <br />Door U-value 2 <br />0.40 <br />0.20 <br />0.40 <br />0.20 <br />0.20 <br />0.20 <br />0.20 <br />0.20 <br />NO <br />(or R-value) <br />(R-2.5) <br />(R-5) <br />(R-2.5) <br />(R-5) <br />(R-5) <br />(R-5) <br />(R-5) <br />(R-5) <br />Option — may be a <br />Collings: <br />better choice. <br />" <br />with attics <br />R-38 <br />R-38 <br />n•38 <br />R- 8 <br />n•38 <br />R-38 <br />n-38 <br />R-38 <br />Notes: <br />vaulted <br />R30 <br />n-30 <br />R-30 <br />N-30 <br />R-30 <br />R-30 <br />R-30 <br />R-30 <br />Wong: <br />above grade <br />R-21 <br />R-19 <br />R-21 <br />R-19 <br />R-21 <br />n-21 <br />R-19 <br />t <br />n-19 <br />below grade <br />or interior <br />1`11-21 <br />R-19 <br />R-21 <br />R-19 <br />R-21 <br />R-21 <br />R-21 <br />R-21 <br />exterior <br />11-10 <br />R-10 <br />R-10 <br />n-lo <br />n-10 <br />R-10 <br />R-10 <br />R-10 <br />,: <br />Floor <br />Slab on grads <br />n-30 <br />R-10 <br />R-30 <br />R-10 <br />R-30 <br />R-10 <br />n-30 <br />R-10 <br />R-30 <br />R-10 <br />R-30 <br />n-10 <br />R-30 <br />n-10 <br />R-30 <br />R-10 <br />Approved by: <br />Footnole: <br />--- <br />Dale: <br />1) n5loam shoaling required In addition to Rig csvlly <br />Insulation. <br />2) Glaring and door U-values may be weighted to meet <br />the Option U-value requirement. <br />_ <br />77 <br />'Page <br />1 01 6( <br />WEESWflAW PT[hanrn iggi <br />