My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1025 90TH ST SW 2018-01-02 MF Import
>
Address Records
>
90TH ST SW
>
1025
>
1025 90TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2025 3:23:49 PM
Creation date
4/19/2017 1:55:57 AM
Metadata
Fields
Template:
Address Document
Street Name
90TH ST SW
Street Number
1025
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ESTIMATE SHEET <br />Receipt # 7 <br />✓ Cost of Work Order <br />Cost of Service Order <br />a as--- ♦ r {71 no LCparuncul; <br />Utilities Division, 3200 Cedar Street <br />Everett, Washington 98201 <br />(425) 257-8800 <br />Date Paid C ?a -per <br />3,305.00 Work Order # <br />Service Order # <br />Contact Person Larry McCauley Telephone # 425-290-9074 <br />Requested By Gordon Witcher Date of Request 8-10-00 <br />Property Owner (name) Same <br />Charge Cost to (name if different than owner) <br />Address PO Box 12088 <br />City Everett <br />Zip 98206 <br />Installation Location 1025 — 90" St SW <br />Installation type/description/size/etc. Hydrant install. Expose 8" in 90th, tap, install control valve and <br />20' (±) 6" DI pipe. Install hydrant and thrust block. Restore area. <br />❑ The followingestimate is based upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation date to <br />allow for scheduline and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the owner <br />thereof, and provided further, that any excess payment shall be returned to the person applying for the installation. <br />*Deposit must be paid prior to ordering parts or scheduling work. <br />WATER METERS 3'AND LARGER MAY HAVEA SIX TO 10 WEEK LEAD TIME, <br />Material <br />Labor and Benefits <br />Equipment Rental <br />TOTAL <br />Prepared by: <br />Accepted by: <br />Crum <br />1,731.00 <br />1,080.00 <br />494.00 <br />$3,305.00 <br />cc: <br />AUG 1 5 2-4:0 <br />....... <br />f'"TY OF (F v E ,. <br />Est. <br />Prepared: I Representing: <br />8-14-00 <br />ESTIMATE GOOD FOR 6 MONTHS <br />Bldg. Permit Center <br />Clair Olivers <br />Tom Thetford <br />Kirk Brooks <br />Gordon Witcher <br />Robert Waddle <br />Stan Mitchell <br />(Paul McKee <br />Gerry Crum <br />Alan Locke <br />Couar NCCAULEY(LN& 14=) <br />of <br />
The URL can be used to link to this page
Your browser does not support the video tag.