Laserfiche WebLink
/{E-INSPECTION REPORT <br />Address—[L-L_=�b <br />Contractor. CwhQ f <br />Owner C�Qtma . o1% <br />Date <br />U APPROVAL ❑�` ,P�A�RTIAL APPROVAL <br />VIO��]ON LWOIiRECTION REQUESTED <br />&Conections listed below MUST BE MADE before work can be approved. <br />J Please contact inspector and arrange for appointment. <br />U WgP4f0t able to perform inspection. <br />ALL 259-NIO FOR REINSPECTION — 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector <br />Date 7 �—_ <br />TYPE OF INSPECTION REQUESTED <br />U Temp. Elect. <br />U Footing <br />U Framing <br />U Drywalr, Nailing <br />U Gas Piping <br />U Consultation <br />U Foundation <br />U Ductwork <br />U Shear Nailing <br />U Grid <br />U Groundwork <br />U Wood Stove <br />U Masonry <br />J Rough -in <br />U Slruct. Slab <br />Cd Fkral <br />J Service <br />J Other <br />J Insulation <br />❑ BLDG: Pmt. No. U MECH: Pmt. No. <br />D*LEC: Pmt. No. ZJ Z��0 PLBG: Pmt. No.. <br />