Laserfiche WebLink
PM0 INSPECTION REPORT <br />Address <br />Contractor l� <br />Owner <br />Date J — <br />U APPROVAL J PARTIAL APPROVAL <br />U VIOLATION j CORRECTION REQUESTED <br />J Corrections listed below MUST BE MADE before work can be approved. <br />U Please contact inspector and arrange for appointment. <br />J Was not able to perform inspection. <br />J CALL 259-8810 FOR REINSPECTION - 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector <br />TYPE OF INSPECTION RE <br />J Temp. Elect. <br />❑ Framing <br />U Drywall, Nailing <br />J Footing <br />J Foundation <br />U Shear Nailing <br />J Ductwork <br />Grid <br />Rough -in <br />J Wood Stove <br />J Masonry <br />J Service <br />U Other <br />Date 112. — T _ <br />J Gas Pipping <br />J Consultation <br />J Groundwork. <br />J Strucl. Slab <br />J Final <br />J Insulation <br />❑ BLDG: Pmt. No. 0VECH: Pmt. No. "Ivy 74 <br />U ELEC: Pmt. No. U PLBG: Pmt. <br />