My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
304 91ST PL SE 2018-01-02 MF Import
>
Address Records
>
91ST PL SE
>
304
>
304 91ST PL SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2022 8:45:18 AM
Creation date
4/19/2017 2:05:08 AM
Metadata
Fields
Template:
Address Document
Street Name
91ST PL SE
Street Number
304
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSED CH WORK ORDERS REPORT <br />Total Utility Maintenance Management System <br />06/04/1996 - Page 1 <br />Date Range :01/09/1989 - 05/20/1996 <br />CM Work Order Range :1001091070001 - UT1002- - Pattern :7101236710139 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101236710139 Title: REPAIR 304 - 91ST PLACE S.E. <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> <br />Item ID: DCB1885M07 -- CATCH BASIN <br />Location ID: -- <br />Program 710 Function 123 Activity 671 <br />Date Completed: 05/16/1996 <br />Overall Craft: <br />Issued: 05/16/1996 Issued by: HDA Assigned to: <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: HL <br />Labor: <br />Craft ID---- <br />-- <br />Name <br />-------------------- ---------- <br />Planned Hrs <br />Actual Hrs <br />Cost <br />EO MJL2 <br />MITCHELL, JEFFREY L. <br />----------- <br />0.00 <br />____ <br />-2 <br />__________ <br />UL NCR <br />NIETHAMER, CHARLES R. <br />00 <br />37.06 <br />0.00 <br />2.00 <br />28.04 <br />Total <br />---------- <br />Labor Cost: <br />65.10 <br />Vehicles: <br />ID <br />-------- <br />Description <br />------------------------------ <br />Hours <br />Cost <br />VJ0004 <br />'95 CHEV 1-TON <br />2.00 <br />12.20 <br />Total Vehicle Cost: <br />12.20 <br />Work Description: <br />--------- ------ <br />REPAIREDCB <br />15 --------------------------------- <br />-------------------------------- <br />Total cost for work order 7101236710139: 77.30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.