My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2704 91ST ST SE 2018-01-02 MF Import
>
Address Records
>
91ST ST SE
>
2704
>
2704 91ST ST SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2022 3:48:54 PM
Creation date
4/19/2017 2:17:01 AM
Metadata
Fields
Template:
Address Document
Street Name
91ST ST SE
Street Number
2704
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAST ESTIMATE SHEET <br />Receipt 0 ' 03(-/(D <br />✓ Cost of Work Order <br />Cost of Service Order <br />Contact Person Joe Jackels <br />Requested By Kirk Brooks <br />Property Owner (name) Jackels <br />Charge Cost to (name if different than owner) <br />Public Works Department <br />n� FS� S [D] Utilities Plvislon, 3200 Cedar Street <br />lu^I I{ v r-,erett, Washington 98201 <br />lS (425) ?57-8800 <br />SEP 2 6 20113 <br />Date Paid - 011 <br />EVEP,ETT Work Order # <br />rgineennai uhllc Strllee5 --- <br />Service < trdcr # <br />Telephone # 360 662-9727 <br />Date of P equest <br />9-23-03 <br />Address _18820-3"Ave NE City Arlington lip 98223 <br />Installation Location �� `7�� "A, <br />Installation t),pe/description/size/ete. #1 — 8" connection to now 12". Remove existing blow off, Install <br />reducer and valve to connect to existing 12" main. Contractor to oxpose and restore. <br />❑ The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation date to <br />allow for -scheduling and parts procurement <br />Whrnever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall he charged to the property for which such Installation was made and the owner <br />thereof, and provided further, that any excess payment shall be returned to the person applying for the Installation. <br />"Deposit most he paid prior to ordering parts or scheduling work. <br />WATER METERS3"AND LARGER MAYHAVEA SIX TO 10 WEEKLEAD TIME, <br />Material <br />907.00 <br />Labor and Benefits <br />1,115.00 _ <br />Equipment Rental <br />344.00 <br />Tax <br />41.00 <br />TOTAL <br />52,407.00 <br />Prepared by: Gerry Crum <br />Accepted by: <br />Prepared: <br />9-23.03 <br />cc: Bldg. Permit Center <br />Mark Sadler <br />Kirk Brooks <br />Gordon Witcher <br />Robert Waddle <br />Man Welborn <br />Paul McKee <br />Gerry Crum <br />Alan Locke <br />Representing: _ REOMS <br />DEC 12 w <br />I w:ammen<Inc.fCa. aJ.krh2 DOC t of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.