My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
207 92ND PL SE 2018-01-02 MF Import
>
Address Records
>
92ND PL SE
>
207
>
207 92ND PL SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2022 10:27:53 AM
Creation date
4/19/2017 2:20:53 AM
Metadata
Fields
Template:
Address Document
Street Name
92ND PL SE
Street Number
207
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ApphcaPon Fnr <br />PUBLIC WORKS PERMIT <br />TYPE OR PRINT ONLY <br />`N�✓b; s <o►a4. <br />Omer <br />Describe Proposed Work <br />f f? <br />PROJECT ADDRESS (if known) <br />PUBLIC WORKS DEPARTMENT i^ <br />3200 Cedar Street <br />Everett, WA 98201 259-8810 8 <br />POSTING <br />3Z u/rllof <br />(ling Address \ y <br />City <br />Date L.V /S�Rlfo <br />Public Works Permit /ZZ <br />Building Permit M 9 <br />Pubo, Wore Q <br />ne07 <br />P o -� r, Phone <br />ZIP Phone <br />Attach four (4) copias of plans for proposed work - Draw to scale and note the following If applicable: <br />•Property Lines 'Outline and dimensions of all existing and pn.,rosed structures on the lot •Existing and t <br />'Centerline of street •Indicate North •Show any proposed grading changes •Show measurements <br />PERMIT CONDITIONS: <br />1. All calls for inspection shall be made 24 hours in advance - phone 259-8810, <br />2. All work shall be performed in accordance with this permit and current City of <br />Construction Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUM <br />4. Keep city streets clean at all times. <br />5 Curb gutter and sidewalk in the plat are new and undamaged, any dnnaRge thereto <br />shall be replaced at the discretion of the Public Works inspector. <br />5. Any change in the driveway cut must be approved by the Public Works Inspector, <br />width at prop line limited to existing apron width <br />7. Adjust water boy" to grade at and of construction. <br />it. Driveways shall be completely cured before driving on the. <br />9. Rooftop drainage shall be discharged to the lots fnflitration trench as per the <br />"Residential Roof Downspout System" detail and as per the sizing and location <br />information on the lot's site plan. Any change in the Infiltration trenca must be <br />approved by the Public Works Inspector. Cali for inspection prior to covering. <br />k PEW cr <br />W <br />O <br />Z <br />0 <br />♦♦ <br />� <br />C0^ <br />O <br />a, <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harmless <br />the City of Everett from any and all claims for damages, costs. expenses, o, <br />uctlon Data causes of action that may arise because of Installation and malnterance of <br />the Improvement or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace public property <br />/"'x ,/9damaged thereby. <br />Approved as Constructed <br />RJR <br />aa��. . ,1r w � — _ARM <br />•4� <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br />COMPLETION, THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.