Laserfiche WebLink
INSPECTION REPORT <br />►�a <br />Address �` St- <br />1)� Contractor__ ►' — <br />1, <br />APPROVAL J PARTIAL APPROVAL <br />J VIOLATION J CORRECTION REQUESTED <br />• Corrections listed below MUST BE MADE before work can be approved. <br />J Please contact inspector and arrange for appointrrant. <br />J Was not able to perform inspection. <br />J CALL 259-BEtg FOR REINSPECTION — 24 hour r otice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED iND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />Inspec''. <br />T PE OF INSPECTION REOUEST <br />Wouni <br />J Framing <br />J Gas Piping <br />J Orywal9 Nailing <br />J Consultation <br />J Shear Nailing <br />J Gridg <br />J Groundwork <br />J Struct. Slab <br />J Ductwork <br />J Wood Stove <br />Rouj Servg ein <br />J�I"nsR etion <br />J Masonry <br />J Other <br />dhr" t`i'. Pmt. No. <br />5/ 2 / U MECH: Pmt. No. <br />U ELEC: Pmt. No. <br />— U PLBG: Pmt. No. <br />