My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2521 92ND PL SE 2018-01-02 MF Import
>
Address Records
>
92ND PL SE
>
2521
>
2521 92ND PL SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2022 10:41:34 AM
Creation date
4/19/2017 2:22:14 AM
Metadata
Fields
Template:
Address Document
Street Name
92ND PL SE
Street Number
2521
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ESTIMATE SHEET <br />Receipt fl <br />Public Works Department <br />Utilities Division, 3200 Cedar Street <br />Everett, Washington 98201 <br />(425)257-8800 <br />Date Paid /O —d —0-1 <br />✓ Cost of Work Order 2,265.00 Work Order # <br />Cost of Scrvice Order Service Order # <br />Contact Person _Joe Jaekels _ Telephone # 360 662.9727 <br />Requested By Kirk Brooks _ _ Date of Request 9-23-03 <br />Property Owner (name) _Jaekels <br />Charge Cost to ,,:,.ne if different than owner) <br />Address 1842C — 3rd Ave NE City Arlin tg on Zip 98223 _ <br />Installation Location �—ti�� 1�Z ` d 106 Srr <br />Installation type/description/sizr./-ete. #3 — 8" tap. Connect new contractor installed main to existing _ <br />AC main. Contractor to expose and restore. <br />❑ The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation date to <br />allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufricient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such Installation was made and the owner <br />thereof, and prosided further, that any excess payment shall be returned to the person applying for the Installation. <br />"Deposit must be paid prior to ordering parts or scheduling work. <br />WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br />Material <br />Labor and Benefits <br />Equipment Rental <br />Tax <br />TOTAL <br />766.00 <br />1,116.00 <br />344.00 <br />99.00 <br />42,265.00 <br />cc: Bldg. Permit Center <br />Mark Sadler <br />Kirk Brooks <br />Gordon Witcher <br />Robert Waddle <br />Matt Welborn <br />Paul McKee <br />Gerry Crim <br />Alan Locke <br />Prepared by: Gerry erg a 8st• <br />Accepted by: Prepared: Representing: <br />9.23-03 <br />FSTIMATE GOOD POR fi MONTHS <br />RECORDS <br />DEC 12 2003 <br />5 vCry mnkWi Wu,l wJuttl,i DX <br />_3_ of_-3_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.