Laserfiche WebLink
JBLIC WORKS PERMIT COMMC-. . S <br />4. Connect side sewer per City Standard #601. <br />5. Connect side sewer per City Standard #'s 601. 602, 604. <br />6. Connect all rooftop downspouts to the side sewer. <br />7. Connect rooftop downspouts to the drainage system provided for this lot. <br />8. Rooftop runoff must be discharged to a roof downspout Infiltration system per City of Everett Storm <br />Manual 3-2.6.2. The approximate size trench Is 3.5' wide, 2' deep and 25' long. Sev attachment for <br />more details. <br />9. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br />beginning the project. <br />10. Install erosion control measures as determined by the Public Works Inspector, such as silt fence, straw <br />bales, sweles, or erosion blankets. <br />11. Install erosion control measures per City of Everett Standards for small parcels <br />12, Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />13 All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br />permitted site. No wasting of material is allowed on this building lot. <br />14. - No dirt, mud, rocks or debris to be tracked onto roadway. <br />15. No building materials to bn stacked on sidewalks and sidewalks to be kept clean and open for <br />pedestrian travel. <br />16. Adjust water meter box 1" above sidewalk grade. <br />17. Remove and replace curb, gutter and sidewalk as por City of Everett Standard Plan #'s 305A 8 306 on <br />this proposal's frontage ss directed by the Public Works Inspector (i.e. all unused driveways and any <br />broken or damaged area must be replaced). <br />18. Install a Type I concrete driveway per City of Everett Standard #307. <br />19. Pave driveway from the front property line out to the street paving. <br />20. Contact the Water District for connecting provisions for this building's water and <br />sewer services. <br />21. A catch basin as per City Standard Plan #402 with a pas lrep per Standard Plan #410 Is required for the <br />parking area. <br />22. If a sewer pump system is to be Installed, the pressure line must discharge Into a private manhole, then <br />gravity pow across the public right-of-way. <br />23. A sprinkler system is required for this building in compliance with the requirements of NFDA Standards <br />13D. <br />FOR PUBLIC WO'2KS INSPECTION, CALL RANDY AT 425-339-7403 / CLIFF AT 425-339.7404 <br />PWCaomenrs <br />