My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
605 92ND ST SE 2018-01-02 MF Import
>
Address Records
>
92ND ST SE
>
605
>
605 92ND ST SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2022 12:37:34 PM
Creation date
4/19/2017 2:28:37 AM
Metadata
Fields
Template:
Address Document
Street Name
92ND ST SE
Street Number
605
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />CLOSED CM WORK ORDERS RE4&TPOSTING - u <br />City of Everett Total Utility Maintenance Management Sys em <br />06/09/1993 Page 1 <br />Date Range :11/09/1900 - 06/09/1993 <br />CM Work Order Range :0810800810001 - 8405421080229Pattern :7401196647620 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />CM WORK ORDER ID: 7401196647620 Title: SO 605 92ND ST SE <br />Item ID: -- <br />Location ID: -- <br />Program 740 Function 119 Activity 664 <br />Date Completed: 06/09/1993 <br />Overall Craft: <br />Issued: 05/04/1993 Issued by: SKL Assigned to: <br />Out of Service? NO Priozity: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />Name <br />Planned Hours <br />Actual <br />Hours Cost <br />--------- <br />----- ------ <br />WSW MKC <br />------------------------------ <br />MOORE, KIM C. <br />------------- <br />0.00 <br />------------ <br />5.00 95.50 <br />UL NSO <br />NIELSEN, SCOTT O. <br />0.00 <br />5.00 66.10 <br />Materials: <br />Number <br />ID <br />Description <br />Date <br />Used <br />Cost <br />-Z---------- <br />------------------------------ <br />-------- <br />------ <br />---------- <br />ADAP34000547 <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />05/06/1993 <br />1 <br />7.72 <br />BOX000056247 <br />BOX METER PLA 15" X loll W/LID <br />05/06/1993 <br />1 <br />12.00 <br />CORP34001847 <br />CORP STOP 3/4" CCT X INSTA @ <br />05/06/1993 <br />1 <br />15.01 <br />METE36089447 <br />METER 5/8" TRIDENT <br />05/06/1993 <br />1 <br />29.60 <br />PIPE34060647 <br />PIPE 3/4" POLY I.P.S. <br />05/06/1993 <br />39 <br />11.70 <br />SADD44016847 <br />SERVICE SADDLE 6" W/3/4" CCT <br />05/06/1993 <br />1 <br />10.40 <br />SETT34033647 <br />SETTER COP 5/8" X 3/4" LGTH15" <br />05/06/1993 <br />1 <br />4641 <br />Vehicles: <br />� 3r <br />ID <br />Description <br />Date <br />Hours <br />------ <br />Cost <br />--------- <br />------------ <br />V2034 <br />------------------------------ <br />PICKUP S10 4X4 86 <br />-------- <br />05/06/1993 <br />5.00 <br />27.00 <br />V3505 <br />BACKHOE CASE 82 <br />05/06/1993 <br />5.00 <br />91.500 <br />Work Description:��" <br />3/4" SFR <br />Total cost for work order 7401196647620: 412.94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.