Laserfiche WebLink
( I <br />COMMENTS FROM PREVIOUS PCRM'TS ..... <br />4. Connect rooftop downspouts to the drainage system provided for this lot <br />S. Install erosion control measures per City of Everett Standard (2-1.1 of Stormwatea Manual) for small <br />parcels <br />6. Keep City streets clean at all times <br />7. Provide any dust control as instructed by the Public Works Inspector <br />8. Contact the MUKILTEO Water District for connecting provisions for this building's water and sewer <br />services. <br />9. Grading to be done so as not to impact adjoining properties. Slopes to be ro steeper than 2:1 and <br />any rockeries/retaining walls must be 3' or less unless approved by the Public Works Inspector <br />FOR PUBLIC WORKS INSPECTION CALL CLIFF LINDMAN AT 425-339.7404 <br />l <br />