My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
231 92ND ST SW 2018-01-02 MF Import
>
Address Records
>
92ND ST SW
>
231
>
231 92ND ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 12:56:19 PM
Creation date
4/19/2017 2:41:19 AM
Metadata
Fields
Template:
Address Document
Street Name
92ND ST SW
Street Number
231
Notes
SEE 9212 HOLLY DR FOR WHOLE SITE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I 3LIC WORKS PERMIT COMMEN <br />4. Connect side sewer per City Standard #601. <br />5. Connect side sewer per City Standard #'s 601, 602, 604. <br />6. Connect all rooftoo downspouts to the side sewer. <br />Connect rooftop downspouts to the drainage system provided for this lot. <br />6. Rooftop runoff must be discharged to a roof downspout Infiltration system per City of Everett Storm <br />Manual 3-2.6 2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See attachment for <br />more details. <br />9. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br />beginning the project. <br />10. Install erosion control measures as determined by the Puhlic Works inspector, such as sill fence, straw <br />bales, swales, or erosion blankets. <br />11. Install erosion control measures per City of Everett Standards for small parcels <br />12. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />13. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br />permitted site. No wasting of material is allowed on this building lot. <br />n14. � No dirt, mud, rocks or debris to be tracked onto roadway. <br />No building materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br />pedestrian travel. <br />16. Adjust water meter box 1" above sidewalk grade. <br />17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A 8 306 on <br />this proposal's frontage as directed by the Public Works Inspector (i.e. all unused driveways and any <br />broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard #307. <br />19. Pave driveway from the front property line out to the street paving. <br />20. Contact the 4A1X;;2,.7Z-0 Water District for connecting provisions for this building's water and <br />sewer services. <br />21. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan 4410 is required for the <br />parking area. <br />22. If a sewer pump system is to be Installed, the pressure line must discharge Into a private manhole, then <br />gravity flow across the public right-of-way. <br />23. A sprinkler system Is required for this building In compliance with the requirements of NFDA Standards <br />13D. <br />FOR PUBLIC WORKS INSPECTION, CALL RANDY AT 425-339-74011CLIFF AT 425-339.7404 <br />MCanments <br />
The URL can be used to link to this page
Your browser does not support the video tag.