Laserfiche WebLink
COMMENTS FROM PREVIOUS PERMITS..... <br />4. Connect rooftop downspouts to the drainage system provided for this lot <br />S. Install erosion control measures per City of Everett Standard (2.1.1 of Stormwater Manual) for small <br />parcels <br />6. Keep City streets clean at all times <br />7. Provide any dust control as instructed by the Public Works Inspector <br />8. Contact the MUKILTEO Water District for connecting provisions for this building's water and sewer <br />services. <br />9. Grading to be done so as not to Impact adjoining properties. Slopes to be no steeper than 2:1 and <br />any rockeries/retaining walls must be 3' or less unless approved by the Public Works Inspector <br />FOR PUBLIC WORKS INSPECTION CALL CLIFF LINDMAN AT 425-339-7404 <br />