Laserfiche WebLink
Site Address: <br />ELECTRICAL <br />Temp Sely ce <br />Groundwork <br />❑ Slab/Conduft <br />❑ Rough In <br />[] Service <br />L] Grounding <br />Ceiling Grid <br />i. _j Electrical Final <br />SITE WORK <br />1.1 Footing drains <br />(l Roof drains <br />140-" <br />INSPECTION REPORT <br />Date Permit <br />Contractor: <br />Owner: <br />TYPE OF INSPECTION REQUESTED <br />BUILDING <br />MECHANICAL <br />L] LIFER ground <br />❑ Gmundworkslab <br />Footing <br />❑ Rough In <br />U Foundation <br />❑ Ceiling Grid <br />❑ S[p+cturat Slab <br />❑ OK to insulate <br />gaming <br />❑ Rooftop Units <br />(] Insulation <br />E) Mechanical Final <br />Ll Drywall Nailing <br />(-j Shear Nailing <br />[ ] Root Nailing <br />]Ceiling Grid <br />( I Building Final <br />CONSULTATION. <br />(] TIAL APPRO <br />(OVAL <br />OR T C O iRECI ION R <br />OR C O (_-1 VIOLATION <br />RL.E t0 PERFORM INSPECTION _ <br />i. 1A.251 257-B8B1 FOR REINSPECTION <br />PLUMBING <br />[-j GtoundwoWSlab <br />❑ Rough In <br />❑ Ceiling Grid <br />OK to Insulate <br />❑ Water Service <br />❑ Medical Gas <br />f ] Plumbing Final <br />GAS PIPE <br />❑ Rough InService Hot Water Tank <br />El Refrigeration ❑ Rough In <br />Ll Gas Pipe Final (] HWT Final <br />FINAL APPROVAL THIS PERMIT <br />11 <br />24 hour notice required <br />TO►�SUL�Tta: ---- <br />Inspector: -- <br />Date 2-X-199- <br />I io", rol <br />V-1..�1(y �j�j� I�MN\\HIINIIIMIN\ � Ilfl\M AM <br />