My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
230 93RD PL SW 2018-01-02 MF Import
>
Address Records
>
93RD PL SW
>
230
>
230 93RD PL SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 9:18:38 AM
Creation date
4/19/2017 2:49:29 AM
Metadata
Fields
Template:
Address Document
Street Name
93RD PL SW
Street Number
230
Notes
SEE 9212 HOLLY DR FOR WHOLE SITE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date. 111512009 <br />Public Works Permit #: PW0901-010 <br />City of Everett Public Works Department <br />3200 Cedar Street 3) b� l,r.: Building Permit #: C0901-007 <br />Everen.VVA 98201 1 4• Planninq Reference # <br />(425)257-8810 11 <br />Public Works Fee $: $ 25,00 <br />Other $: <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />CAMDEN CT LLC OWNER., <br />3726 BROADWAY STE 301 <br />EVE.RETT WA 98201 i ri�IVE <br />1 SC <br />PHONE: 4252122210 tL IS],rP!WN.Er'r'' <br />TAX PARCEL ID # 00392300001003 '" '` SITIEA66RESS: 230 93RD PL SW <br />DESCRIPTION OF PROPOSED WORK: <br />NEW HOME- BASIC 332 <br />MCWHERTER LN- UNIT 10 <br />PERMIT CONDITIONS <br />1 All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construchon Standards <br />and Specifications. <br />3, Call Location Underground Service 48 hrs before you dig TOLL FREE NUMBER 811 F- <br />4. Connect rooftop downspouts to the drainage system provided for this lot <br />5. Install erosion control measures per City of Everett Standard (2.1,1 of Stormwater Manual) for small parcels <br />6. Keep City streets clean at all times <br />7 Provide any dust control as instructed by the Public Works Inspector <br />8. Contact the MUKILTEO Water District for connecting provisions for this building's water and sewer services. <br />9 Grading to be done so as not to impact adjoining properties. Slopes to be no steeper than 2:1 and any <br />rockeries/retaining walls must be Y or less unless approved by the Public Works Inspector <br />FOR PUBLIC WORKS INSPECTION CALL CLIFF LINDMAN AT 425339-7404 <br />App ved for Construction Date <br />as Constructed <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />public property damaged thereby <br />`�— 31 l51cJ <br />Signature of Applicant <br />Dale <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 186 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.