My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
237 93RD PL SW 2018-01-02 MF Import
>
Address Records
>
93RD PL SW
>
237
>
237 93RD PL SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2022 2:15:25 PM
Creation date
4/19/2017 2:50:51 AM
Metadata
Fields
Template:
Address Document
Street Name
93RD PL SW
Street Number
237
Notes
SEE 9212 HOLLY DR FOR WHOLE SITE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORDS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everetfz"WA 98201 09-03-20(TH ) <br />(425KR T.8810 REG-1 <br />f'ERHIT No.a1M3 <br />Date: <br />8/26/2009 <br />Public Works Permit #. <br />PWO908-048 <br />Buildinq Permit k <br />C0908-023 <br />0ninq Reference # <br />AW <br />CT Plublic Works Fee $ <br />$ 25.00 <br />Other $ <br />OWNER NAME AND ADDRESS: <br />1 BLDG. <br />APgWQl NAME AND ADDRESS: <br />CAMDEN COURT LLC <br />1 MECI <br />191.0) <br />1 PAC <br />3100.NJJ <br />3726 BROADWAY #301 <br />1 PLBG <br />iIS11.(0 <br />EVERETT WA 98201 <br />1 DRIVE <br />S K ,(ej <br />PHONE: 4252122210 <br />1 B C <br />PHONAri.50 <br />TAX PARCEL ID # 0039230000103 <br />SW <br />DESCRIPTION OF PROPOSED WORK: <br />NEW HOUSE (BASIC 329) <br />MCWHERTER LN SPACE 37 <br />PERMIT CONDITIONS <br />1 All calls for inspection shall be made 24 hours in advance <br />2 All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications <br />3 Call Location Underground Service 48 his before you dig TOLL FREE NUMBER 811 <br />4 Connect rooftop downspouts to the drainage system provided for this lot <br />5 Install erosion control meas-lres per City of Everett Standard (2-1 1 of Stormwater Manual) for small parcels w <br />6 No dirt, mud, rocks or debris to be tracked onto roadway <br />7 No building materials to be stacked on roadway and roadway to be kept clean and open for pedestrian travel �r <br />8 Contact the Mukdteo Water District for connecting provisions for this build,ng's water and sewer services <br />9 Grading to be done so as not to impact adjoining properties Slopes to be no steeper than 2 1 and any <br />rockeries/retaining walls must be 3' or less unless approved by Public Works Inspector C <br />FOR PUBLIC WORKS INSPECTION CALL CLIFF LINDMAN A 425-339-7404 "ED <br />z <br />0 <br />C <br />AM <br />Approved for Construction Date <br />F1NyiN SPEC11ON Date <br />Approved as Constructed <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned ownedapphcant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages costs. expenses, or causes of Fiction that may arise <br />because of installation and maintenance of the Improvement <br />or other right-ol-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />public roperty damaged thereby. / <br />Signature of Applicant <br />Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION, THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />TO POSTINGI-�b ��' <br />
The URL can be used to link to this page
Your browser does not support the video tag.