Laserfiche WebLink
PUBLIC WORKS PERIJIIT COMMENTS <br />A. Connci:t sidr_ setver per Ci�y S�andard Y.u(�' <br />5. Connect side s�Ker per C�ty Standard tl's Su 7. 602, f,Od <br />6 Connect all rooftop downspou!s to Ihe side sewer <br />7_ Connect rooltop downspouts to the drainage syst� m prov�ded Ior Ih�s lot <br />fi Rooftop runoff must be discharged to a roof doNnspout i�i6ltration syslem pr,r City of Evr�ett Smrm <br />�lanual ;-2 G.2 The approximale size trench is 3.5' wida 2' deep and ?5' long See attachment for <br />more details <br />� 9 l he coNraclor must meel with �he Public Works inspector lo diswss po�ential drainage routing pnor to <br />beginning ihe project. <br />10. Install erosion conlrol measures as delermined by lhe Public Works inspector, sur,h :is ,iit lona�, stra,v <br />bales, swales, or erosion blankets. <br />11. �nst•�tl erosion control measures per City ol Everett Standards for smai! parcel� <br />12 Remove erosion control measures upon complelion of the project prior !o final npprnv,d nt tl.�� perm t <br />i;i �q excnv:derl mnlrii;il (iuni (uunda��un. side�.valF_ �nil drivrtwayc, sh�ll be Lrtul��d ��r an aipprov�id. <br />�mimdlc�l talu Nn v�nslinu u� ninlorial tt. nlhiw�Id on Ifuti buddinq In� <br />1q Ilu du�. niiul. i�ni.s ni duhnti �n hc �i.�cHrd nnlo iotid�v�iy <br />IG No buildm� malerials lo be slacked on sidewalks ,i��,d s�fr�.�-;il�.•, to be kr�{,t drnn ,ind n��rn lui <br />pedeslrian trTvel. <br />1f Adjust water meter box 1" above side�nalk gradn <br />t7 R�inove and replace curb, c�utter and sidewalk as p�.� C�ty nl L�o�r9� Stnnd;nd Plnn t:�� 3p5A & 3U8 un <br />Ih�s propo5al'S (rOnlage as direCted by Ihe Public Works Inspeclor i� e nll unuso�l ,tnvuwnpti and a+np <br />!n�,H_en or damayed area must be roplaced�. <br />I t+ Inst�ll a Type I concret« driveway per City of Everetl Standard #307 <br />� 9. Pave driveway Irom the front properry line oul to the streel paving <br />_—,. <br />.0. � Contacl the : �_..�.:".'- � Waler Dislnd for connechng provisiuns fu� th�s butld�n��'s watr.r end <br />" � sewer services. <br />21 A catch basin as per Cdy Standard Plan #402 wilh a gas trap per Slandard Plan #410 is required lor the <br />parking area. <br />72 If a sewer pump system is to be instalted, lhe pressure line must discharge iNo a private manhole, R�en <br />gravity flow across ttie public right-of-way. <br /><''s A sprinkler system is required for this building in compliance with Ihe requirements of NFDA Standards <br />13D <br />I f �I��. I�I i��.l I� �,' �� �I;V�! �. II151'f f'.I It ��,J. i�l�l � f:ANI)1 4l _l;"r 331-�-7-0113 � CLIFf- AT d'2Ci-3'}g-740�1 <br />� ', <br />