Laserfiche WebLink
PUBLIC WORKS <br />PERMIT <br />FOULIC WORKS DLPAH 114'.7 <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257.8810 <br />OWNER NAMF John Kunkel APPLICANT UAMF <br />AND ADORE' `. ANDADDnEss <br />501 93rd St SW <br />EVERETT 1 98204 <br />PHONE (425)330-1410 PHONE <br />TAY PARCFL 1 D A PROJECTAODRESS Rn <br />DESCRIPTION OF <br />PROPOSF-O WORK Install culvert and fill ditch <br />PERMIT CONDITIONS <br />Date 4/18/2001 <br />Puakc WorksPermil q PWO104-023 <br />Building Permit A <br />Planning Relerence A <br />Public Works Fee S $ 25 . 0( <br />Guarantee S <br />1 98th SIT SW <br />1 All calls for inspection shall be made 24 hours in advance - phone (425) 257.8810 <br />2 All work shall be performed in accordance with this permit and current City of Everett Deslgr I and Construction <br />Standards and Specifications <br />3 Call Location Underground Service 48 hrsbefore you dig TOLL FREE NUMBER 1-800.424-5555 <br />4. Use crushed rock to bed the pipe and a suitable backfill material <br />Pipe materials and installation must meet city standards. <br />5. Call Inspector at 425-339-7404 prior to installation for specific <br />instructions. <br />6. Keep CIS] �cet5 c low A jAII ' j1)4e4 <br />—� fn 6K& 11#101 <br />Approved lot COnsiiuQien Dale <br />FINAL INSPECTION <br />Approved A%eorisnucled Dale <br />04-18-01 <br />3:16PM <br />N <br />0104023 <br />OTHER <br />25.00 <br />TOTAL <br />25.00 <br />A 0M2309 <br />ACKNOWLEDGEMENT Of CONDITIONS <br />The undersigned ownerlapplicani hereby agrees to hold and <br />save harmless the City of Everett from any and all claims Or <br />damages, Costs. expenses. or causes of action that may ansn <br />because of installation and maintenance of the Improvement or <br />other right of-wny use hereto applied lot and further agrees to <br />remove same upon notice Item the City and to replarn public <br />properly d=Pe,r—r�i <br />�nAlure vl gp4lydni Odle <br />"IF <br />WORK AUTHOnIZED BY THIS PEnMiy MUST BE SIARI ED WITHIN 190 DAY' OF DATE PFRMIT 15 ISSUED AND THEREAFTER IS TO DE DIUGENILY PunsyED <br />TO COMPLETION THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION <br />O <br />n <br />