My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/05/26 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/05/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 3:55:47 PM
Creation date
4/19/2017 11:06:53 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/26/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 CITY OF EVERETT <br />FINAL CONTRACT VOUCHER CERTIFICATION <br />CONTRACTOR:Shoreline Construction ADDRESS: PO Box 358 <br />CITY: Woodinville STATE: WA 98072 DATE: April 23, 2010 <br />PROJECT TITLE: Bond Street Interceptor — CSO WORK ORDER NO. UP3407 <br />DATE WORK COMPLETE: April 18, 2010 FINAL AMOUNT: $ 521,747.24 <br />CONTRACTOR'S CERTIFICATION <br />I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br />and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br />authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br />employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br />monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br />understand the dame and that I hereby release the City of Everett from any and all claims of whatsoever nature <br />which I may have, arising out of the performance of said contract, which are not set forth in said estimate. <br />Xll_ t /.fie' X ._��i r <br />CONTRACTOR TITLE <br />Shoreline Construction <br />Subscribed . • to bepVe <br />• ..�� <br />J <br />PUBLIC WORKS DEPARTMENT CERTIFICATION <br />I Certify the attached final APPROVED Date: <br />estimate to be based upon actual <br />measurements and to be true and correct. <br />P <br />X �.u,� X <br />Construction Manager Public Works irector <br />Tom Fuchs Dave Davis <br />INSTRUCTIONS <br />'.011 a 1411,%i <br />p►AY4g; to <br />E y�•. <br />ZjQ <br />$ NOTARY <br />y pulwo i2 <br />"r4. <br />WAS��A �. <br />The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br />agents and forwarded with the Final Contract Voucher Certification. <br />Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br />attached. <br />Revised 9/94 <br />114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.