Laserfiche WebLink
EVERETT CITY. COUNCIL AGENDA.ITElv1. COVER-SHEE`i <br />PROJECT TITLE: <br />Professional Services <br />Agreement with Cosmopolitan <br />Engineering Group for <br />construction engineering <br />services for the Recovered <br />Water Outfall at the Water <br />Filtration Plant <br />Consent <br />X Action <br />First Reading <br />Second Reading <br />Third Reading <br />Public Hearing <br />COUNCIL BILL # <br />Originating Department <br />Contact Person <br />Phone Number <br />FOR AGENDA OF <br />Location Preceding Action Attachments <br />City of Everett Water Authorization to Call for Professional <br />Filtration Plant Bids, 2/10/10 Agreement <br />Budget Committee, <br />5/12/10 <br />Initialed by: <br />Department Head <br />CAA <br />Council President <br />Public Works <br />Jenifer Galatas <br />(425) 257-8229 <br />May 26, 2010 <br />Department(s) Approval <br />Services Public Works <br />Amount Budgeted <br />$2,600,000 <br />Expenditure Required <br />$50,000 <br />Account Number(s): UP -3347 <br />Budget Remaining <br />$970,692.69 <br />Additional Required <br />$0 <br />DETAILED SUMMARY STATEMENT: <br />In response to Washington State Department of Health concerns regarding a water treatment violation in <br />March 2007, the City contracted with Cosmopolitan Engineering Group (CEG) in August 2007 to study the <br />intake pipelines and recovered water discharge in the Lake Chaplain Reservoir at the Water Filtration Plant. <br />CEG recommended the Recovered Water Outfall be extended approximately 4,000 feet into Lake Chaplain <br />and that the recovered water pumps be upgraded to accommodate this extension. The extension of the <br />Recovered Water Outfall will separate the outfall from the intake pipe ensuring that the majority of the <br />recovered water is drawn to the north end of the lake and that the portion of recovered water returning to the <br />plant intakes has undergone significant dilution. <br />This Professional Services Agreement with CEG provides for construction engineering services for the <br />construction of the Recovered Water Outfall in the amount of $50,000. $395,000 has previously been spent <br />on design services and $2,000 for bid advertisement expenses. Council is considering the award of the <br />construction contract under a separate agenda item in the amount of $1,182,307.31. The total expenditure for <br />this account to date is $1,629,307.31. <br />RECOMMENDATION (Exact action requested of Council): <br />Authorize the Mayor to sign the Professional Services Agreement with Cosmopolitan Engineering Group for <br />construction engineering services for the Recovered Water Outfall at the Water Filtration Plant in the amount <br />of $50,000. 229 <br />