My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/05/26 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/05/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 3:55:47 PM
Creation date
4/19/2017 11:06:53 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/26/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT;CI,TY COUNCIL AGENDA ITEIv1 COVER'SHEET <br />PROJECT TITLE: <br />Professional Services <br />Agreement with Tetra Tech <br />Inc. to provide electrical <br />engineering services for the <br />Water Filtration Plant <br />Location <br />Water Pollution Control <br />Facility <br />Amount Budgeted <br />Expenditure Required <br />Budget Remaining <br />Additional Required <br />Consent <br />X Action <br />First Reading <br />Second Reading <br />Third Reading <br />Public Hearing <br />Precediniz Action <br />None <br />$250,000 <br />$22,166 <br />$227,834 <br />COUNCIL BILL 9 <br />Originating Department <br />Contact Person <br />Phone Number <br />FOR AGENDA OF <br />Initialed by: <br />Department Head <br />CAA <br />Council President <br />Attachments <br />Professional Services <br />Agreement <br />Utilities <br />Mike Robinson <br />(425) 257-8884 <br />May 26, 2010 <br />Department(s) Approval <br />Legal <br />AccountNumber(s): UP3361-1 <br />DETAILED SUMMARY STATEMENT: <br />The Everett Water Filtration Plant (WFP) maintains an archive of both electrical and instrumentation <br />drawings. Due to numerous changes to the WFP's processing systems over the past 30 years, these drawings <br />require updating to reflect the plant's current configuration. WFP staff require accurate electrical drawings <br />to facilitate plant operations and maintenance. The new drawings will meet the City of Everett CAD <br />drawings standards. Upon completion of the Professional Services Agreement with Tetra Tech, Inc. the <br />WFP will have completed approximately 15% of the drawing conversion and updating process. <br />RECOMMENDATION (Exact action requested of Council): <br />Authorize the Mayor to sign the Professional Services Agreement with Tetra Tech Inc. to provide electrical <br />engineering services for the Water Filtration Plant in the amount of $22,166. <br />249 <br />
The URL can be used to link to this page
Your browser does not support the video tag.