Schedule <br />• Phase 1 - Hoyt; Summer -Fall 2010 Construction <br />• Accelerated Schedule to take advantage of <br />current favorable bid climate <br />• Design of Phase 2, Rucker Avenue, is currently at <br />60% and will be completed this year. <br />• Phase 2 will be ready to bid by January 2011 for <br />2011 construction should funding be available <br />• Additional funding, including outside sources are <br />being sought. <br />Perteet <br />