Laserfiche WebLink
PERMIT # SW -204 <br />PERMIT PERIOD: JULY 1, 2009 TO JUNE 30, 2010 <br />Page 7of7 <br />28, 2009 Cemex can accept drilling slurry as long as the material meets the <br />description of inert materials as described in Department of <br />Ecology's letter to the Snohomish Health District dated May 28, <br />2009 regarding "Dredged and excavated materials and solid waste <br />handling." <br />