My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/05/26 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/05/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2023 3:55:47 PM
Creation date
4/19/2017 11:06:53 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/26/2010
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snohomish County <br />Industrial Land Policy <br />County -wide Planning Policies <br />From Policy ED 3c: <br />Designate the Paine Field -Boeing area as a Manufacturing/Industrial Center (MIC), recognizing <br />that it is a major, existing regional employment area of intensive, concentrated manufacturing <br />and industrial land uses, including aerospace, aircraft manufacturing and high-technology uses, <br />which is and has historically been so designated in comprehensive plans. <br />The Manufacturing Industrial Center shall: <br />• Accommodate aerospace related employment and associated activities. <br />• Accommodate employment which requires a high floor area to employee ratio but <br />strive to increase the overall employment density within the manufacturing and <br />industrial center; <br />• Encourage a mix of uses which support and enhance manufacturing, aerospace and <br />industrial centers. <br />• Provide adequate public facilities and services, including good access to the region's <br />transportation system, which is essential to the success of the MIC. <br />9 <br />Industrial Land Policy Analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.