My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1018 80TH ST SW JAMCO AMERICA 2018-01-01 MF Import
>
Address Records
>
80TH ST SW
>
1018
>
JAMCO AMERICA
>
1018 80TH ST SW JAMCO AMERICA 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2018 9:14:55 AM
Creation date
4/19/2017 11:52:13 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1018
Tenant Name
JAMCO AMERICA
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
947
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS DEPARTMENT <br /> UTILITIES DIVISION L� I <br /> 3200 CEDAR STREET J U L 15 1985 <br /> EVERETP, WASHINGTON <br /> .......... _ <br /> CITY OF EVERETT <br /> COST ESTIMATE SHEET PvCic Works Dept. <br /> Requested by Tom Thetford Date of Request 7-12-85 <br /> Address 3200 Cedar Phone 259-8821 <br /> Installation Location 80th St. S.W. and 7th Ave, <br /> Installation type/description/size/etc. 0^ tan and hookup to 12" main <br /> Total Estimated Cost <br /> This estimate reflects the Utilities Division having to Saw cut. . .. . . . . . . . . <br /> provide labor, equipment and materials to complete the above Shoring. . . . . . . . . . . . <br /> mentioned installation including, but not limited to, the Excavation. . . . . . . . . <br /> items identified to the right. Any labor and/or equipment Backfill. . .. . . . . . . . <br /> provided by the contractor to facilitate the work by the City Compaction. . . . . . . . . <br /> water department will be reflected in a refund to the person Temporary Patch. . . . <br /> making the deposit. Permanent Patch. . . ._ <br /> Furnish double check valve assembly <br /> for temporary water supply. . . . . ._ <br /> Final hook-up after purity <br /> and pressure testing. . ._ <br /> (Whenever the estimated cost is not sufficient to cover the total expense for labor, <br /> material, equipment rental and administrative costs, the deficit shall be charged to the <br /> property for which such installation was made and the owner thereof, and provided <br /> further, that any excess payment shall be returned to the person applying for the <br /> installation. ) <br /> Itemized Cost Estimate: f <br /> Labor 8 Overhead_ 640.00 A % CV 259-e ezl <br /> Material 1482.00 Estimate Prepared By Phone q <br /> Equipment Rental 124.00 Don Wahl <br /> Surface Restoration cc: Larry Callahan <br /> TOTAL ESTIMATE 2246.00 Don Weitkamp <br /> Larry Crawford <br /> Bob Chervenell <br /> Bud Krom <br />
The URL can be used to link to this page
Your browser does not support the video tag.