Laserfiche WebLink
PUBLIC WORKS DEPARTMENT <br /> UTILITIES DIVISION L� I <br /> 3200 CEDAR STREET J U L 15 1985 <br /> EVERETP, WASHINGTON <br /> .......... _ <br /> CITY OF EVERETT <br /> COST ESTIMATE SHEET PvCic Works Dept. <br /> Requested by Tom Thetford Date of Request 7-12-85 <br /> Address 3200 Cedar Phone 259-8821 <br /> Installation Location 80th St. S.W. and 7th Ave, <br /> Installation type/description/size/etc. 0^ tan and hookup to 12" main <br /> Total Estimated Cost <br /> This estimate reflects the Utilities Division having to Saw cut. . .. . . . . . . . . <br /> provide labor, equipment and materials to complete the above Shoring. . . . . . . . . . . . <br /> mentioned installation including, but not limited to, the Excavation. . . . . . . . . <br /> items identified to the right. Any labor and/or equipment Backfill. . .. . . . . . . . <br /> provided by the contractor to facilitate the work by the City Compaction. . . . . . . . . <br /> water department will be reflected in a refund to the person Temporary Patch. . . . <br /> making the deposit. Permanent Patch. . . ._ <br /> Furnish double check valve assembly <br /> for temporary water supply. . . . . ._ <br /> Final hook-up after purity <br /> and pressure testing. . ._ <br /> (Whenever the estimated cost is not sufficient to cover the total expense for labor, <br /> material, equipment rental and administrative costs, the deficit shall be charged to the <br /> property for which such installation was made and the owner thereof, and provided <br /> further, that any excess payment shall be returned to the person applying for the <br /> installation. ) <br /> Itemized Cost Estimate: f <br /> Labor 8 Overhead_ 640.00 A % CV 259-e ezl <br /> Material 1482.00 Estimate Prepared By Phone q <br /> Equipment Rental 124.00 Don Wahl <br /> Surface Restoration cc: Larry Callahan <br /> TOTAL ESTIMATE 2246.00 Don Weitkamp <br /> Larry Crawford <br /> Bob Chervenell <br /> Bud Krom <br />