My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 3642
>
Resolutions
>
Resolution 3642
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2017 11:24:00 AM
Creation date
4/20/2017 11:23:47 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
3642
Date
7/1/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City/County:CITY OF EVERETT SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998 Hearing Date 'r'/—92, Pg 6 <br /> City No.: 0420 Adoption Date 7-/-9Z- <br /> County No.: 31 TRAFFIC SIGNALS Resolution No.._& Z <br /> •F P AROJECT IDENTIFICATION m T C F PROJECT COSTS IN THOUSANDS OF DOLLARS IN THOUSANDS$ <br /> U r a 0 A U <br /> N i DESCRIPTION OF WORK jo work T L R N OBLIGATION TOTAL FUNDING SOURCE FEDERAL OBLIGATION PLAN <br /> C o f code A E R D SCHEDULE PLAN <br /> TC r (Street name or number, c (s) L N Y Y E A R FUNDS FEDERAL CAPP, FEDERAL <br /> NL i Co.road name or number, Iw G O S Local RAP, UTILITY AID FIRST 2ND <br /> LA t termini beginning&end. ao T V T 1st 2nd 3rd 4TH, Prog/Amt TIA, CODES PROJECT YEAR THRU <br /> S y Describe work to be done.) sr H E A 5TH, UATA NUMBER ANNUAL 6TH <br /> S No sk R T 6th Prog/Amt ELEMT. YEARS <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 <br /> 19 1 EVERETT AVENUE SIGNAL IMPROVEMENTS 6 I P_ 600 600 102 498 2756 1P.E. <br /> EVERETT-HOYT,WETMORE,ROCKEFELLER,OAKES,CEDAR IR/W <br /> CONST 498 <br /> PROPOSED FAUS PROJECT TOTAL 498 <br /> 19 2 SIGNAL MASTER&INTERCONNECT 6 I • P 100 1 100 I 100 1 300 1 600 1 600 1 1 I CTP 1 P.E. <br /> VARIOUS LOCATIONS <br /> DESIGN&CONSTRUCT SIGNAL INTERCONNECT;UPGRADE ,CONST <br /> SIGNAL MASTER 'TOTAL , <br /> 19 3 TRAFFIC SIGNALS,INTERIM 6 I • F 150 1 150 I 300 1 300 I 900 I I I 1TCP P.S. <br /> VARIOUS LOCATIONS B/W <br /> CONSTRUCT TRAFFIC SIGNALS CONST <br /> OTAL <br /> 19 4 SIGNAL INTERCONNECT 8 I 1 • F 43 1 I I 1 43 1 22 1 21 1 IPT 1 "P.E. <br /> SR 99(108TH-AIRPORT) IRAV <br /> CONST <br /> TIB PROJECT TOTAL <br /> 19 5 HES SIGNAL IMPROVEMENTS 6 I • F 103 1 1 I [ 103 1 10 I 93 1 IPT 1 ,JP.E. 15 <br /> 19TH AVE.SE AT 110TH Fifw <br /> SIGNAL IMPROVEMENTS CONST 88 , <br /> TOTAL 103 <br /> 19 8 DEVELOPER SIGNALS 8 I • F 500 1 500 I 3000 1 5200 I 9200 1 9200 1 I ICPT 1 P.E. <br /> GLENWOOD/MADISON PL;MERRILL CREEK/GLENWOOD;GLENWOOD/M FI/W <br /> MADISON/EVERGREEN;BEVERLY LANE/MADISON;MERRILL CK/SEAWAY CONST <br /> SEAWAY/75TH;CASINO/5TH;HARDESON/75TH,80TH,MERRILL CK; , <br /> JOHN FLUKE DRIVEWAY/SEAWAY TOTAL <br /> 19 7 HES PROJECTS 6 IHDK P 353 I 150 1 I 1 503 1 44 1 459 1 1 PT 1 ,P.E. 45 <br /> GROUP 1:41ST STREET OFF RAMP&BROADWAY,EVERGREEN WAY& $t/W <br /> SOUTH FRED MEYER DRIVEWAY SIGNAL,EVERGREEN&CASINO INTER- CONST 278 135 <br /> SECTION; GROUP 2:BROADWAY GUARDRAIL(52ND TO 42ND) TOTAL 324 135 <br /> P.E. <br /> tR/W <br /> CONST <br /> TOTAL 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.