Laserfiche WebLink
City/County:CITY OF EVERETT SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1993 TO 1998 Hearing Date 7-/-t,Z Pg 8 <br /> City No.: 0420 Adoption Date 7—/-9,Z <br /> County No.: 31 _ TRANSIT IMPROVEMENTS Resolution No. G Z. <br /> F P PROJECT IDENTIFICATION m T C F PROJECT COSTS IN THOUSANDS OF DOLLARS IN THOUSANDS$ ' <br /> U r a 0 A U <br /> N i DESCRIPTION OF WORK jo work T L R N OBUGATION TOTAL FUNDING SOURCE FEDERAL OBLIGATION PLAN <br /> C o f code A E R D SCHEDULE PLAN , <br /> TC r (Street name or number, c (s) L N Y Y E A R FUNDS FEDERAL CAPP, FEDERAL <br /> NL i Co.road name or number, Iw G 0 S Local RAP. UTILITY AID FIRST 2ND ' <br /> LA t termini beginning&end. ao T V T 1st 2nd 3rd 4TH, Prog/Amt TIA, CODES PROJECT YEAR THRU <br /> S y Describe work to be done.) at H E A 5TH, UATA NUMBER ANNUAL 6TH <br /> S No sk R T 6th Prog/Amt ELEMT. YEARS <br /> 1 2 3 4 5 8 7 8 9_ 10 11 12 13 14 15 18 17 18 19 20 <br /> 19 9 MAINTENANCE TOOLS AND EQUIPMENT 11 P 75 75 150 30 120 UMTA 9 P.E. <br /> R/W <br /> CONST <br /> TOTAL 80 60 <br /> 19 10 OPERATIONAL ANALYSIS STUDY 12 P 100 1 I 1 1 100 1 20 1 80 1 1 1 UMTA 9 P.E. <br /> R/W , <br /> CONST <br /> TOTAL 80 <br /> 19 11 TRANSIT CENTER LAND ACQUISITION 10 P 2000 I I 1 1 2000 1 400 I 1600 I 1 1 UMTA 9 P.E. <br /> fi/W <br /> CONST <br /> TOTAL 1600 ' <br /> 19 12 TRANSIT CENTER DESIGN AND CONSTRUCTION 10 •P 1000T 500 J I I 1500 1 300 1 1200 1 I 1 UMTA 9 P.E. <br /> R/W <br /> CONST <br /> TOTAL 800 400 <br /> 19 13 PARK AND RIDE LAND ACQUISITION 10 P 500 1 I I 1 500 1 100 1 400 1 1 I UMTA 9 P.E. <br /> R/W <br /> CONST <br /> TOTAL 400 <br /> 19 14 PARK AND RIDE DESIGN AND CONSTRUCTION 10 P 1000[ 500 I I I 1500 1 300 I 1200 I 1 I UMTA 9 P.E. ' <br /> R/W <br /> CONST <br /> TOTAL 800 400 <br /> -I I I 1 1 1 I I I P.E. <br /> R/W <br /> CONST <br /> TOTAL <br /> I I I 1 1 I 1 I I P.E. <br /> R/W <br /> CONST <br /> TOTAL <br /> s <br /> t <br />