BID TABULATION
<br /> Riverfront Surcharge Phase 3 Schedule B
<br /> W.O.#RD3316
<br /> Date 5/19/2010
<br /> Prepared By:William BarrettPlats Plus,Inc Trimaxx Construction
<br /> For:Tim Marks,Project Engineer ENGINEER'S ESTIMATE J.R.Hayes&Sons,Inc. Granite Northwest
<br /> ITEM UNIT TOTAL UNIT
<br /> TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL
<br /> __ ..
<br /> # ITEM DESCRIPTION UNIT •UANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT
<br /> 1 Mobilization
<br /> 1 $45,000.00 $45,000.00 $0.01 $0.01 $20,000.00 $20,000.00 $23,500.00 $23,500.00 $30,000.00 $30,000.00
<br /> 2 Construction Survey LS 1 $12,000.00 $12,000.00 $13,745.07 $13,745.07 $6,000.00 $6,000.00 $3,500.00 $3,500.00 $2,100.00 $2,100.00
<br /> 3 Site Demolition&Salvage LS 1 $23,100.00 $23,100.00 $16,318.89 $16,318.89 $12,000.00 $12,000.00 $8,500.00 58,500.00 $15,000.00 $15,000.00
<br /> 4 Temporary Erosion& LS 1 $20,000.00 $20,000.00 $46,799.63 $46,799.63 $8,000.00 $8,000.00 $6,500.00 $6,500.00 $13,000.00 $13,000.00
<br /> Sedimentation Control
<br /> 5 Hydroseeding Acre 1.5 $700.00 $1,050.00 $641.09 $961.64 $650.00 $975.00 $615.00 $922.50 $640.00 $960.00
<br /> 6 Excavate uncontaminated soil, CY 8,000 $5.00 $40,000.00 $5.46 $43,680.00 $3.00 $24,000.00 $4.00 $32,000.00 $7.00 $56,000.00
<br /> stockpile,move,place and compact
<br /> on-site
<br /> 7 Excavate,transport,and off-site Ton 6,000 $70.00 $420,000.00 $44.95 $269,700.00 $60.00 $360,000.00 $53.80 $322,800.00 $52.00 $312,000.00
<br /> disposal of contaminated soil
<br /> 8 Contaminated dewatering LS 1 $5,000.00 $5,000.00 $3,743.83 $3,743.83 $17,000.00 $17,000.00 $35,000.00 $35,000.00 $2,800.00 $2,800.00
<br /> Discharge
<br /> 9 Soil Sampling&Testing HR 100 $200.00 $20,000.00 $91.54 $9,154.00 $150.00 $15,000.00 $180.00 $18,000.00 $190.00 $19,000.00
<br /> Coordination
<br /> .1 Underground Storage Tank FA 1 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00
<br /> Removal&Closure
<br /> 11 ORC Building LB 1,000 $10.00 $10,000.00 $14.44 $14,440.00 $7.50 $7,500.00 $15.00 $15,000.00 $9.50 $9,500.00
<br /> 12 Monitoring Wells/Gas Probes, EA 2 $500.00 $1,000.00 $512.88 $1,025.76 $50.00 $100.00 $550.00 $1,100.00 $380.00 $760.00
<br /> Adjust Grade
<br /> 13 Monitoring Wells/Gas Probes, EA 2 $500.00 $1,000.00 $2,564.38 $5,128.76 $825.00 $1,650.00 $850.00 $1,700.00 $1,300.00 $2,600.00
<br /> Decommision
<br /> 14 Settlement Plates EA 4 $700.00 $2,800.00 $135.25 $541.00 $360.00 $1,440.00 $95.00 $380.00 $750.00 $3,000.00
<br /> r..r
<br /> C..)