Laserfiche WebLink
3 <br />* SEPA threshold determinations frequently include mitigation requirements as <br />provided for. in the SEPA ordinance (Chapter 20.04). Any SEPA condition based on <br />SEPA substantive authority as provided for in the SEPA ordinance (Chapter 20.04) shall <br />be identified in the land use permit decision, as provided in this integrated local project <br />review process. <br />* * An open public hearing maybe required under the following circumstances, in <br />which case the, application shall be processed under Review Process III: (i) a public <br />hearing is required by Title 18; (ii) any affected person files a written request for a <br />hearing with the planning department within twenty-one days of the notice of application <br />(public comment period); or (iii) either prior to or within the public comment period, the <br />director or the city engineer and/or their designees require an open public hearing <br />is hereby amended to read as follows: <br />Decisions included. <br />A. Review Process II applications include the following administrative decisions:* <br />Alteration of a designated significant feature within an historic overlay zone; <br />2. Alteration of category II and III streams as provided by Section 19.33D.500(B)(2); <br />3. Atrium appurtenance approval as provided by Section 19.39.040(B)(2); <br />4. Buffer width reduction for streams (Sections 19.33D.490(D) and 19.37.170(C)) or <br />wetlands (Sections 19.33D.450(E) and 19.37.110(C)) or alteration of geologically <br />hazardous areas or standard buffer (Section 19.37.080(C)) if proposal is not categorically <br />exempt under SEPA; <br />5. Change or expansion of a nonconforming use (up to twenty-five percent) as provided <br />by Section 19.38.030(C) and (D); <br />6. Comprehensive design plan permits as provided by Section 19.36.210; <br />7. Design guideline approval, when proposal includes modification of development <br />standards and design guidelines and for projects not categorically exempt under SEPA; <br />8. Determination of proportionality for correctional facilities; <br />9. Determination of prohibited heavy. manufacturing uses with potentially noxious <br />impacts in M-1 and M -M zones as provided by Sections 19.27.020(G)(19) and <br />19.28.020(D)(18); <br />24 <br />