My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/06/16 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/06/16 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 9:36:43 AM
Creation date
4/21/2017 10:30:28 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/16/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37. All other review processes listed in the zoning code as Review Process II; <br />38. All Review Process I and project permit applications that are not categorically <br />exempt under SEPA; <br />39. Alternative best available science decisions as provided by Section 19.37.050(E); <br />40. Accessory buildings over two hundred square feet which have metal siding or <br />corrugated roofing as provided by Section 19.0_7.020(K); <br />41. Accessory buildings which exceed one thousand square feet in area as provided by <br />Section 19.07.020(M); <br />42. Accessory buildings which exceed fifteen feet in height as provided by Section <br />19.07.0200; <br />43. Rockeries and retaining walls retaining soil (fill) four feet or greater in height in <br />required building setback areas, as provided by Section 19.39.150(C)(5)(d). <br />* SEPA threshold determinations frequently include mitigation requirements as <br />provided for in the SEPA ordinance (Chapter 20.04). Any SEPA condition based on <br />SEPA substantive authority as provided for in the SEPA ordinance (Chapter 20.04) shall <br />be identified in the land use permit decision, as provided in this integrated local project <br />review process. <br />* * An open public hearing may be required under the following circumstances, in <br />which case the application shall be processed under Review Process III: (i) a public <br />hearing is required by Title 18; (ii) any affected person files a written request for a <br />hearing with the planning department within twenty-one days of the notice of application <br />(public comment period); or (iii) either prior to or within the public comment period, the <br />director or the city engineer and/or their designees require an open public hearing <br />Section 2: Subsection 2(B) of Chapter 6 of Ordinance No. 2530-01, as amended (EMC <br />15.24.080), which reads as follows: <br />15.24.080 Review Process II—Administrative decisions. <br />Public notice shall include notice of application and notice of decision. Public notice of <br />the notice of application shall be provided by: <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.