My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/06/16 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/06/16 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2017 9:36:43 AM
Creation date
4/21/2017 10:30:28 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/16/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FA <br />ILI <br />2.2.. Noncompliance ā Enforcement. Any B-2 or R-2 uses occurring on the site not <br />related to or commonly associated with Mission use; or uses of the property other than those <br />defined herein, shall be grounds for enforcement action. Any modifications not authorized as <br />provided herein shall be deemed to constitute a breach of this Agreement and constitute a <br />violation of the City's Zoning Code. <br />2.3. Modification ā,Major / Minor. Requests for modification to this Development <br />Agreement deemed major modifications shall be carried out under the same process that led to <br />its formation, i.e. Planning Commission recommendation followed by a hearing before the City <br />Council to determine if Council wishes to approve the requested modification. Major <br />modifications include, but are not limited to, uses allowed in the B-2 zone other than the <br />permitted use of an office for the Everett Gospel Mission and R-2 uses. Rebuilding of the <br />existing building would be considered a minor amendment. Modifications the City deems <br />"minor" may be submitted to the Planning Director for consideration and administrative <br />approval. <br />2.3. Violation ā Enforcement. Any action to enforce this Agreement by the City, or <br />any default or breach of this Agreement by the Mission, shall leave the Mission responsible for <br />the City's costs and attorneys fees. The venue for such action shall be in Snohomish County <br />Superior Court. Further, if use of the property, including structure(s), yard or parking is <br />inconsistent with the terms of this Agreement, all entitlements to the 13-2 zone shall be forfeited, <br />and any use inconsistent with the B-2 zone shall be deemed a violation of the Zoning Code. <br />Uses or changes to the sign deemed inconsistent with this Agreement by the City. In both cases <br />such violation and / or inconsistency shall be subject to all violation, enforcement and penalty <br />provisions associated with violations of the City's Zoning Code. <br />s⢠<br />
The URL can be used to link to this page
Your browser does not support the video tag.