My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/06/30 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/06/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2017 11:28:01 AM
Creation date
4/21/2017 11:26:42 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/30/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> INTERLOCAL AGREEMENT BETWEEN THE CITY OF <br /> EVERETT AND THE PORT OF EVERETT FOR THE PORT OF <br /> EVERETT INFRASTRUCTURE IMPROVEMENT PROJECT <br /> THIS AGREEMENT is made and entered into by and between the City of Everett, a first class <br /> charter city under the laws of the state of Washington (the "CITY"), and the Port of Everett, a <br /> port district under the laws of the State of Washington(the"PORT"). <br /> The City of Everett (CITY), operating under an extension of Washington State Departments of <br /> Transportation Local Programs Certification Acceptance (CA), is to define, for the Port of <br /> Everett (PORT) for the federal funded PORT Infrastructure Improvement Project, the <br /> responsibilities for grant administration, consultant selection, consultant agreements, <br /> development of plans, specifications, and estimate, environmental documents, acquisition of <br /> right of way, advertisement, award and execution of contract, and construction administration <br /> including but not limited to inspection, change orders and final project documentation. <br /> The PORT shall administer the PORT Infrastructure Improvement Project entirely in accordance <br /> with the Local Agency Guidelines (LAG), this Agreement and direction as provided by the <br /> CITY. Failure to comply with the LAG, this Agreement or the direction of the CITY may result <br /> in loss of Federal funds. <br /> 1) The CITY'S CA Manager and the PORT'S Project Manager are: <br /> CITY PORT <br /> City of Everett Port of Everett <br /> Ryan Sass, P.E. John Klekotka, P.E. <br /> City Engineer Chief of Engineering & Planning <br /> 3200 Cedar Street P.O. Box 538 <br /> Everett, WA 98201 Everett, WA 98206 <br /> (425) 257-8942 (425) 388-0715 <br /> FAX (425) 257-8856 FAX (425) 388-0702 <br /> E-mail —rsass@ci.everett.wa.us E-mail—johnk@portofeverett.com <br /> 2) All formal submittals outlined herein, either from the CITY or from the PORT, will be sent <br /> through the designated CA Manager. <br /> 3) The PORT shall obtain concurrence from the CITY for any Grant application or submittal <br /> that requires CA status and administered under this document prior to submittal to the <br /> appropriate Grant Program administrator. <br /> 4) The PORT shall obtain approval from the CITY in the solicitation and selection of a <br /> Consulting Engineering firm for Right of Way and Construction Engineering services. In <br /> 74 <br /> Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.