My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/07/07 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/07/07 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2017 11:47:54 AM
Creation date
4/21/2017 11:47:26 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/7/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERM-'CITY COUNCIL AGENDA ITEM COVER ST-IEET <br /> i.. 4 <br /> PROJECT TITLE: <br /> Construction contract for the Consent COUNCIL BILL# <br /> Sewer System Replacement F Action Originating Department PW/Utilities <br /> Schedule B, Project,Work First Reading Contact Person David Voigt <br /> Order#UP 3300-2 with KLB Second Reading Phone Number 425-257-8983 <br /> Construction, Inc. Third Reading FOR AGENDA OF <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> North Everett Council authorized call Project Location Map, Public Works <br /> for bids on May 19, 2010 Bid Tabulation <br /> Amount Budgeted $4,700,000 <br /> Expenditure Required $2,805,474.20 Account Number(s): UP 3300-2 <br /> Budget Remaining $1,894,525.80 <br /> Additional Required 0 <br /> DETAILED SUMMARY STATEMENT: <br /> Construction bids were received from ten contractors on June 29, 2010, for the Sewer System Replacement F <br /> Schedule B Project. The proposals include pricing for restoration/replacement of certain streets using either <br /> asphalt pavement or cement concrete. The lowest responsive and responsible bid is $2,701,174.20 for <br /> asphalt and $2,805,474.20 for concrete, from KLB Construction Inc. The Engineers Estimate is $4,530,000 <br /> for asphalt and$4,680,000 for concrete. It is recommended that the project be awarded to KLB Construction <br /> Inc. for their concrete bid, at a cost of$2,805,474.20, including sales tax. <br /> This project replaces approximately 7,400 linear feet of deteriorated combined sewer mains, manholes and <br /> storm drainage systems and replaces approximately 135 residential side sewer connections. Most street and <br /> alley restoration consists of full-width pavement with new curbs and sidewalks. This project is the last of a <br /> series of three sewer replacement projects in the northwest corner of the Port Gardner Neighborhood(Rucker <br /> Hill). Construction is scheduled for August 2010 through May 2011. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Award the construction contract and authorize the Mayor to sign the contract with KLB Construction Inc. for <br /> the Sewer System Replacement F Schedule B Project UP3200-2, in the amount of$2,805,474.20,including <br /> sales tax. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.