Laserfiche WebLink
Sheet 2 of 2 CITY OF EVERETT Contract No. 33001 <br /> Public Works Department. <br /> Date: 6/23/10 CHANGE ORDER ESTIMATE Change Order No.4 <br /> Old New Unit Unit Estimated Estimated <br /> Item Item of Price Quantity Amount of <br /> X-Heavy Coated Steel Casing, <br /> 36 36-inch,Augor Bore LF $740.00 (8.00) ($5,920.00) <br /> X-Heavy Coated Steel Casing, <br /> 37 30-inch,Augor Bore LF $626.60 (2.83) ($1,773.28) <br /> Schedule 20 Steel Casing, 20- <br /> 38 inch, Install Augor Bore LF $1,243.00 (2.00) ($2,486.00) <br /> Top Soil,Type A <br /> 47 CY $45.00 (170.00) ($7,650.00) <br /> Hydroseeding <br /> 48 SY $3.00 3,771.00 $11,313.00 <br /> Concrete Sidewalk <br /> 50 SY $52.00 (50.00) ($2,600.00) <br /> Concrete Curb <br /> 51 LF $32.00 (150.00) ($4,800.00) <br /> Crushed Surfacing Top Course <br /> 53 TON $24.00 26.58 $637.92 <br /> Crushed Surfacing Base Course <br /> 54 TON $22.50 (2,951.30) ($66,404.25) <br /> Gravel Borrow <br /> 55 TON $12.75 (2,237.62) ($28,529.66) <br /> Foundation Material Class A <br /> 56 TON $20.00 (495.40) ($9,908.00) <br /> Force Account <br /> 57 FA $1.00 5,683.37 $5,683.37 <br /> X-Heavy Coated Steel Casing, - <br /> 65 42-inch,Augor Boring LF $952.40 (12.00) ($11,428.80) <br /> TSI Labor Rate Increase Cost <br /> 70 LS $2,301.44 1.00 $2,301.44 <br /> GG Labor&Tax Rate Increase <br /> 71 Cost LS $3,179.40 1.00 $3,179.40 <br /> MOH -30" HDPE Pipe-Bond <br /> 102 Street LS $4,975.50 1.00 $4,975.50 <br /> Summary of dollars sheet 2 of <br /> 2 work order 33001 ($113,409.35) <br /> Summary of Sheet 1& 2 of 2 <br /> work order 33001 ($207,032.65) <br /> Summary of work orders <br /> 2770A,27708&33001 ($284,281.98) <br /> 8 <br />