Laserfiche WebLink
3 EXHIBIT B <br /> COMPENSATION <br /> Water Transmission Line 3 - Phase 7 Replacement Project <br /> Engineering Design <br /> Estimated Project Cost Summary <br /> Task Task Description Cost ($) <br /> Task 1.0 - Project Management $ 19,195.27 <br /> Task 2.0 - Quality Assurance /Quality Control $ 22,610.15 <br /> Task 3.0 - Supplemental Surveying And Mapping $ 20,087.23 <br /> Task 4.0 Update Geotechnical Design Criteria $ 51,788.10 <br /> Task 5.0 - Permit Assistance $ 6,946.01 <br /> Task 6.0 - Final Design $ 124,137.78 <br /> Task 7.0 - Opinion Of Probable Construction Cost $ 9,298.81 <br /> Task 8.0 - Bidding Assistance $ 19,155.40 <br /> Task 9.0 - Construction Management Services (Future <br /> Task)1 $ 0.00 <br /> Task 10.0 - Undefined Services $ 40,983 <br /> TOTAL $ 314,201.58 <br /> Note 1: Task 9 - Construction Management Services, if authorized by the City of Everett will be <br /> added by supplemental agreement. <br /> 2 <br /> 44 <br />