My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/09/08 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/09/08 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 11:13:56 AM
Creation date
4/24/2017 11:13:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pricing for the City of Everett,WA <br /> Wireless Sewer Flow Monitoring Project <br /> September 2010—December 2012 <br /> > <br /> Exhibit B-3 page 1of2 <br /> 2010 <br /> Task Description #of #of Unit Price Subtotal <br /> Station Months <br /> 1&2 Install/Maintain/Report/Removal or Wireless Flow Meters for 6 4 $ 985 $ 23,640 <br /> Hydraulic Model Calibration and Pipe Capacity in Selected Trunks <br /> and Interceptors. No Redundancy,Radar,or Rain Gauges in the <br /> Task <br /> 1&2 Install/Maintain/Report/Removal of Wireless Rain Gauges2 4 $ 256 $ 2,048 <br /> 3 Install/Maintain/Report/Removal or Wireless Flow Meters to 2 4 $ 985 $ 7,880 <br /> track quantity and rate of sewer flows received into the City <br /> system from outside sewer agencies <br /> 4 Install/Maintain/Report/Removal of Wireless Flow Meters to 4 4 $ 985 $ 15,760 <br /> detect and measure sewer CSO events,No redundancy <br /> 1-1 5 Install/Maintain/Report/Removal of Wireless Flow Meters at 4 $ 2,425 $ - <br /> Co temporary Locations(relocated monthly)in conjunction with <br /> waste strength sampling by WPCF Industrial Retreatment Group <br /> 6 Additional FlowWorks Sites-Set Up(Flow Meter or Rain Gauge) 6 1 $ 225 $ 1,350 <br /> 7 Additional FlowWorks Sites-Monthly(Flow Meter or Rain Gauge) 6 4 $ 50 $ 1,200 <br /> 8 Additional Area Velocity Probe Installation 1 $ 225 $ - <br /> 9 Additional Area Velocity Probe Monthly Fees 3 4 $ 25 $ 300 <br /> 10 Relocate Flow Monitoring Station 2 1 $ 1,050 $ 2,100 <br /> 2010 Monitoring Total: $ 54,278 <br /> AA <br /> )SFE// <br /> c�oet <br /> i/ <br /> 0E/20/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.