My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010/09/08 Council Agenda Packet
>
Council Agenda Packets
>
2010
>
2010/09/08 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 11:13:56 AM
Creation date
4/24/2017 11:13:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 1 <br /> "Low Capacity 36 Inch Pipeline"refers to the portion of the existing 36-inch gravity <br /> sewer pipeline between Manhole 2085Z05 and Manhole 2085Z07 as shown in Exhibit B <br /> and Exhibit C. <br /> "High Capacity 36-Inch Pipeline"refers to the portion of the existing 36-inch gravity <br /> sewer pipeline north of Manhole 2085Z07 as shown in Exhibit B and Exhibit C. <br /> "Manhole 2085Z05"refers to the manhole as shown in Exhibit B and Exhibit C. <br /> "Manhole 2085Z07"refers tothe manhole as shown in Exhibit B and Exhibit C. <br /> "Manhole SL"refers to the manhole as shown in Exhibit B and Exhibit C. <br /> "New Manhole A"refers to a new manhole as shown in Exhibit C. <br /> "New Manhole B"refers to a new manhole as shown in Exhibit C. <br /> "New Manhole C'refers to a new manhole as shown in Exhibit C. <br /> "New 30 Inch Pipeline"refers to a new pipeline with a capacity of at least 11,200 gpm <br /> that connects the Existing 30-Inch Pipeline,New Manhole A,New Manhole B,New <br /> Manhole C,Manhole 2085Z07, and the High Capacity 36-Inch Pipeline as shown in <br /> Exhibit C. <br /> "New District Pipeline"refers to a new pipeline that connects the District's pipeline at <br /> Manhole SL to the New 30-Inch Pipeline at New Manhole B as shown in Exhibit-C. <br /> "District Flow"refers to a flow of sewage or wastewater from the District. It is <br /> determined as the average maximum flow measured over a one hour period. <br /> B. Interceptor Work. <br /> 1. Requirements for Plans and Specifications. The District at its sole cost shall <br /> prepare all plans and specifications necessary to construct sewer improvements <br /> that modify the sewer system infrastructure at 116th Street SE and 35th <br /> Avenue SE in accordance with Exhibit C. These plans and specifications must <br /> include the following: <br /> (a) New Manhole A,New Manhole B, and New Manhole C; <br /> (b) New 30-Inch Pipeline; <br /> (c) New District Pipeline; <br /> (d) All improvements necessary to block the Existing 30-Inch Pipeline <br /> between New Manhole A and Manhole 2085Z05 as shown in Exhibit C; <br /> (e) All improvements necessary to block the existing pipeline between <br /> Manhole SL and Manhole 2085Z05 as shown in Exhibit C; <br /> Page 2 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.